
static protection requirements
for maintenance
1-12
for troubleshooting
1-2
SUA card
removing
5-24
replacing
5-26
preparing CTS after replacing
5-27
T
tape
caution about removing manually from
CTS
4-3
for troubleshooting the CTS
1-3
microcode update, time needed for
creating tape
3-5 – 3-6
removing manually from CTS
4-1 – 4-6
what to do before removing manually from
CTS
4-2
testing
after FRU replacement
1-15
See also entries under each FRU
time-to-clean LED indication
2-2
tools
for maintenance
1-13
for troubleshooting
1-2
top panel
removing
5-12
replacing
5-13
preparing CTS after replacing the
5-14
troubleshooting
guidelines
1-3
manuals for
1-2
software for
1-2
static protection requirements for
1-2
table of errors
1-4
U
upgrading microcode
3-1 – 3-10
using this manual
x
V
VUA-SLD flex cable
removing
5-34
replacing
5-35
preparing CTS after replacing
5-36
VUA/SUA card
removing
5-24
replacing
5-26
preparing CTS after replacing
5-27
October 1992
I
-
3
Index
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...