
Preparing the CTS for operation
After removing a cartridge from the CTS, do the following to prepare
the CTS for operation:
Perform a...
Successful test
Unsuccessful test
1.
Power-on (if
possible; if not,
contact your
vendor)
■
Assuming there is no data
cartridge loaded, the top and
bottom LEDs are off and the
middle LED might be flashing
when a successful power-on
self-test is complete.
■
The top and middle LEDs
flash.
Make sure the power cable
and SCSI cable are
correctly installed.
Try the power-on self-test
again. If it fails again,
contact your vendor.
2.
Cartridge
load/unload
■
The cartridge loads and
unloads without getting
caught on the bezel.
■
The cartridge gets caught on
the bezel during the load or
unload operation.
Make sure the bezel is fully
seated and straight on the
front of the CTS.
■
The CTS door closes after
you pull out the cartridge.
■
The CTS door does not close
after you pull out the cartridge.
Make sure the bezel does
not interfere with the door.
■
The load mechanism loads
and unloads the data
cartridge.
■
The load mechanism is not
functional.
Replace the deck
subassembly.
3.
Cleaning (with
EXABYTE or
EXABYTE-approved
8mm cleaning
cartridge)
4
-
6
510702
4 Removing a Cartridge from the CTS
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...