
Preparing the CTS for Operation After
Maintenance
After performing each maintenance procedure, follow the instructions
provided after each procedure to prepare the CTS for operation.
These instructions indicate which procedures and EXPERT tests you
should perform.
Table 1-3 lists the procedures and tests that you should perform after
each maintenance procedure. For more details about the tests or
procedures and the results you should expect, refer to the chapter for
the maintenance procedure you are performing.
Procedure or field
replaceable unit (FRU)
Tests or procedures to
perform after replacement
Where discussed...
Loading microcode
EXPERT WrtVari
Chapter 3
Removing a cartridge
■
Cleaning
■
Cartridge load/unload
page 4-1
Chassis panels
■
Power-on self-test
■
EXPERT WrtVari
Chapter 5
Deck subassembly
■
Update microcode
■
EXPERT Motion
page 5-43
Door and retainer
Cartridge load/unload
page 5-48
Front bezel
■
Power-on self-test
■
Cartridge load/unload
page 5-4
SLD card
■
Update microcode
■
Update EEPROM image
■
EXPERT WrtVari
page 5-33
VUA card
EXPERT WrtVari
page 5-27
VUA/SLD flex cable
EXPERT WrtVari
page 5-36
For any of the EXPERT tests listed in this table, refer to the EXPERT
User’s Guide for the 8mm Cartridge Tape Subsystem for more information.
Table 1-3 Tests and procedures to perform after maintenance
October 1992
1
-
15
1 Before You Begin
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...