
74
HPS-III-Nadelverschluss-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of HPS III valve gate hot runner systems
Picture 50: Installation of the guiding system version 1
z381-06
5.5.15 Installation of the guiding system version 1 for synchronous plate systems
1. Screw the shoulder screw (pos. 23) into the intermediate
plate (pos. 54) as far as it will go in order to locate the
synchronous plate.
2. Note
: Guide pillar (pos. 24.1) and ball cage (pos. 24.2)
are delivered pre-assembled.
The guide bushing with flange (pos. 24.3) which has to
be installed in the clamping plate (pos. 51) is slipped
over the ball cage. Disassemble the three parts before
installation.
3. Drive the guide pillar (pos. 24.1) into the synchronous
plate (pos. 19) until it sits flush with the bottom edge of
the synchronous plate. Apply a thin coat of high perfor-
mance grease (see chapter „5.3.1 Tools and operating
materials“) to the ball cage. Slide the ball cage over the
guide pillar until it hits the surface of the synchronous
plate.
Sharp edges and heavy components
•
Cut injuries to body and extremities, mainly to the hands.
•
Crushing of fingers or hand.
Pressurised systems
During installation all hydraulic or pneumatic supply lines must be de-
pressurised.
•
Injuries caused by flying parts or "whipping" hoses.
•
Injuries to eyes caused by escaping pressurised liquids.
WARNING!
Содержание HPS III
Страница 2: ......
Страница 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Страница 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Страница 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...