
53
HPS-III-Nadelverschluss-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of HPS III valve gate hot runner systems
5.5.7 Drive unit placed on manifold (coupled)
Installation on the manifold
Picture 36: Drive unit placed on manifold (coupled) - installation
z342-11
1. Slide the drive unit (pos. 9) carefully and without tilting
over the centring device (pos. 9.1) until it sits flush.
Pay attention to the position of the dowel pin (lock
against rotation) which is pre-installed in the manifold
(pos. 9.2, ISO 8735) .
Connected power supply during installation
Risk of deadly electric shock or severe injuries due to live compo-
nents.
•
The hot runner system and the mould have to be disconnected
from the voltage source during installation.
HAZARD!
WARNING!
Sharp edges and heavy components
•
Cut injuries to body and extremities, mainly to the hands.
•
Crushing of fingers or hand.
Pressurised systems
During installation all hydraulic or pneumatic supply lines must be de-
pressurised.
•
Injuries caused by flying parts or "whipping" hoses.
•
Injuries to eyes caused by escaping pressurised liquids.
Содержание HPS III
Страница 2: ......
Страница 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Страница 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Страница 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...