
73
HPS-III-Nadelverschluss-Heißkanalsystem_Montage_BA_V-2-0_EN
Installation of HPS III valve gate hot runner systems
Picture 49: Installation of the synchronous plate version 1
z381-05
5.5.14 Installation of the synchronous plate version 1
Suspended load
Death and severe crushing of body or extremities.
•
Keep clear of and do not pass under suspended loads.
•
Keep clear of suspended loads while they are being transported.
•
Do not touch lifting devices and lifting accessories while lifting the
load.
•
Only lift, transport and set down loads, if you have received ap-
propriate training.
•
Only use suitable and undamaged lifting devices and lifting
accessories which are checked regularly.
•
Do not exceed the maximum load limit of lifting accessories.
Sharp edges and heavy components
•
Cut injuries to body and extremities, mainly to the hands.
•
Crushing of fingers or hand.
WARNING!
1. Bolt the intermediate plate (pos. 54) to the nozzle retai-
ner frame plate (pos. 53).
2. Place the synchronous plate (pos. 19) in the intermedia-
te plate (pos. 54).
Содержание HPS III
Страница 2: ......
Страница 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Страница 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Страница 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...