
35
HPS-III-Heißkanalsystem_Vorspann-Prüfmaße-System_BA_V-2-0_EN
Pos. 1 Locating ring
Pos. 2 Sprue bush
Pos. 3 Manifold
Pos. 4 Top pressure pad (depending on nozzle type)
Pos. 5 Pressure pad with centering (centre support)
Pos. 6 Lock against rotation of manifold
Pos. 7 Tilting preventing pad of manifold
(depending on order, only for standard installation)
Pos. 8 HPS III-S nozzle for standard installation
Pos. 9 Fixation of nozzle (lock against rotation for tip
exchange in the mould)
Pos. 10 HPS III-S nozzle for front installation
Pos. 11 Screw connection for manifold
(The screw connection for the manifold is only
required when nozzles for standard installation are
used.
When nozzles for front installation are
installed the manifold must not be screw
connected.
)
Pos. 50 Insulating plate
Pos. 51 Clamping plate (e.g. 1.2312) > 1000 N/mm²
Pos. 53 Nozzle retainer frame plate
(e.g. 1.2312) > 1000 N/mm²
Pos. 56 Contour plate
BR
Installation space (for EWIKON parts)
H1
Manifold height
H2
Manifold height
+ top pressure pad
H3
Manifold height
+ pressure pad with centering (center support)
+ top pressure pad
P
Height of nozzle retainer frame plate
B
Height of top pressure pad
KH
Nozzle body height
X
Nozzle length
(lower edge of nozzle body to article surface)
∆S
Gap dimension delta S is achieved by:
frame plate provided with allowance (pos. 52)
as shown in the drawing (recommended by
EWIKON) or grinding of the top pressure pads
on the manifold.
Example: Dimensions to be checked for a HPS III hot runner system with HPS III-S nozzles
for standard installation and front installation
Installation
Содержание HPS III
Страница 2: ......
Страница 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Страница 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Страница 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...