
5
HPS-III-Nadelverschluss-Heißkanalsystem_Inhalt_BA_V-2-0_EN
5.6.6 Wiring of 6-drop hot runner systems (manifold with 2 control zones) ......................................................................... 95
5.6.7 Wiring of 8-drop hot runner systems (manifold with 2 control zones) ......................................................................... 96
5.6.8 Wiring of 8-drop hot runner systems (manifold with 4 control zones) ......................................................................... 97
5.7
Checks after installation .............................................................................................................................................. 98
6.
Start-up and instructions for operation .................................................................................................................. 99
6.1
Safety instructions ....................................................................................................................................................... 99
6.2
Requirements for operation ....................................................................................................................................... 101
6.3
Start-up of a HPS III hot runner system .................................................................................................................... 102
6.3.1 First-time start-up and filling of a HPS III hot runner system
..................................................................................... 102
6.3.2 Start-up of an already filled HPS III hot runner system
............................................................................................. 102
6.3.3 Colour and material changes .................................................................................................................................... 102
6.4
Instructions for the operation of valve gate systems ................................................................................................. 104
6.4.1 Machine downtimes > 5 minutes of systems with HPS III-S nozzles (system / single tip / single cavity) ................. 105
6.5
Possible malfunctions ............................................................................................................................................... 106
6.5.1 Troubleshooting
......................................................................................................................................................... 106
7. Maintenance
............................................................................................................................................................ 107
7.1
Safety instructions ..................................................................................................................................................... 107
7.2
Instructions for maintenance ..................................................................................................................................... 107
7.3
Maintenance schedule .............................................................................................................................................. 107
7.4
Installation / deinstallation of nozzle tips ................................................................................................................... 108
7.4.1 Safety instructions ..................................................................................................................................................... 108
7.4.2 General information ................................................................................................................................................... 109
7.4.3 Versions of nozzle tips, nosepieces and screw-on gate bushes ............................................................................... 110
7.4.4 Exchange of nozzle tips with nozzle installed in the mould ....................................................................................... 111
7.4.5 Exchange of nozzle tips outside the mould ............................................................................................................... 111
7.4.6 Deinstallation of one-piece nozzle tips ...................................................................................................................... 112
7.4.7 Installation of one-piece nozzle tips .......................................................................................................................... 113
7.4.8 Deinstallation of two-piece nozzle tips ...................................................................................................................... 114
7.4.9 Installation of two-piece nozzle tips ........................................................................................................................... 115
7.5
HPS III-S nozzles – exchange of thermocouple ........................................................................................................ 117
7.5.1 Safety instructions ..................................................................................................................................................... 117
7.5.2 Clamping of nozzle in a vice ..................................................................................................................................... 118
7.5.3 HPS III-S3 (valve gate) nozzles – exchange of thermocouple .................................................................................. 119
7.5.4 HPS III-S4.5 (valve gate) nozzles – exchange of thermocouple ............................................................................... 123
7.5.5 HPS III-S6/9/12/18 (valve gate) nozzles – exchange of thermocouple ..................................................................... 127
7.6
Deinstallation / exchange of valve pins ..................................................................................................................... 130
7.6.1 Drive units with pistons - deinstallation und exchange of valve pins ......................................................................... 130
7.6.2 Electric drive unit – deinstallation and exchange of valve pins ................................................................................. 132
7.7
Instructions for service and repair ............................................................................................................................. 133
8. Decommissioning
................................................................................................................................................... 134
8.1
Safety instructions ..................................................................................................................................................... 134
Content
Содержание HPS III
Страница 2: ......
Страница 116: ...116 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN...
Страница 122: ...122 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...
Страница 126: ...126 HPS III Hei kanalsystem_Instandhaltung F hlerwechsel S SXE_BA_V 2 0_EN Maintenance...