
INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G e
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
7
INSTALLATION CHECKLIST
UNPACK
COOKTOP
COMPONENTS
8
CLEARANCE
DIMENSIONS
9
PREPARE COUNTER TOP FOR INSTALLATION
10 - 13
INSERT
CHASSIS
IN
COUNTER
TOP
14
INSTALL DRIP PAN AND DRIP PAN GASKET
15 - 16
ASSEMBLING COOK SURFACE RETAINING FASTENERS
17
CONNECTING TEMPERATURE SENSOR WIRE TO
18
COOKING
SURFACE
POSITIONING
TEMPERATURE
SENSORS
AND
19
LOWERING COOKING SURFACE
RETAINING
COOKING
SURFACE 20
CONNECT ELECTRICAL AND GAS LINES
21
DISPLAY PANEL AND TEMPERATURE CONTROL
22 - 23
SPILLOVER TRAY REMOVAL AND CLEANING
24
COOKING
SURFACE
MAINTENANCE
25
APPENDIX - CONTROL COMPONENTS
26 - 27
PAGE #