
23
2527245-02-01/22 (translation of the original operating instructions)
Operating Instructions
Safety System MGBS-P-L.-AP…
EN
11.7. Connector assignment of safety switch MGBS-…-AP-…-SA-…
with plug connector M12, 8-pin
Wiring diagram C
Plug connector
(view of connection side)
Pin
Designation
Function
Conductor color-
ing of connecting
cable
1)
1 x M12
8
5
6
7
2
4
3
1
1
IMP
Solenoid operating voltage, 24 V DC
WH
2
UB
Electronics operating voltage, 24 V DC
BN
3
FO1A
Safety output, channel A
GN
4
FO1B
Safety output, channel B
YE
5
OI
Diagnostic monitoring output
GY
6
OD
Door position monitoring output
PK
7
0VUB
Electronics operating voltage, 0 V DC
BU
8
IMM
Solenoid operating voltage, 0 V DC
RD
1) Only for standard EUCHNER connecting cable.
11.8. Connector assignment of safety switch MGBS-…-AP-…-SII-…
with plug connectors 2 x M12, 5-pin
Wiring diagram D
Plug connector
(view of connection side)
Pin
Designation
Function
Conductor color-
ing of connecting
cable
1)
2 x M12
X2.5
X2.4
X2.3
X2.1
X2.2
X1.5
X1.4
X1.3
X1.1
X1.2
X 1.1
UB
Electronics operating voltage, 24 V DC
BN
X 1.2
FO1A
Safety output, channel A
WH
X 1.3
0VUB
Electronics operating voltage, 0 V DC
BU
X 1.4
FO1B
Safety output, channel B
BK
X 1.5
-
n.c.
GY
X 2.1
-
n.c.
BN
X 2.2
-
n.c.
WH
X 2.3
IMM
Solenoid operating voltage, 0 V DC
BU
X 2.4
IMP
Solenoid operating voltage, 24 V DC
BK
X 2.5
-
n.c.
GY
1) Only for standard EUCHNER connecting cable.