14
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
A
A
B
B
C
C
D
D
E
E
F
F
Progettato da
Controllato da
Modificato da, il
Data
Edizione
Foglio
/
A2emec_Modificato
Massimo_F
27/01/2010
00
Toll.
Gen.
`
0.05
Materiale:
1
1
To manual venting hose
Venting knob
To suction hose
to delivery hose
Injection valve must be installed on plant from water’s input.
Injection valve will open at pressure greater than 0,3 bar.
On request 1, 2, 3, 4 or 5 bar injection valve are available.
Injection valve
Insert one side of venting hose into discharge connector as shown in fig 8.
Insert other side of venting hose into product’s tank.
During priming procedure product exceeding will flow into tank.
Venting hose
Fig. 8. Manual venting pump head model (K PLUS).
For priming procedure see
PRIMING
.
it’s allowed to lightly bend venting hose.
During calibration procedure (“TEST”) insert venting hose into BECKER test-tube.
Содержание K AC PLUS 1018
Страница 26: ...26 Main board Fig 12 Main board scheme L N COIL OPTION level input N O C N C...
Страница 30: ...30 0218 l h 18 bar 2 Pump head mod M l h bar 0501 l h 1 bar 5 Pump head mod I l h bar...
Страница 32: ...32...
Страница 33: ...33 Dimensions Fig 15 Dimensions...
Страница 36: ...36...