E-SC 400 / 402 Classic Series Instruction Manual
Tools Needed for Installation
Power Drill
Crescent Wrench
Flat Head Screwdriver
Hacksaw / Sawzall
Phillips Head Screwdriver
C
-
Ring Pliers
Tape Measure
Level
Wire Strippers
C
-
clamps
3/8”, 1/4”, 5/16” Drill Bits
Protect all ingoing and outgoing wires with a surge suppressor.
Consult your local dealer for more information.
!
Other items that may be needed prior to commencing installation.
BOLDED
items are necessary to all
applications.
Start and stop post, bracket or gate stop. Although the Estate Swing E
-
SC 400 features soft start /stop and is
used with limit switches, having stops in place ensure a more secure end position.
16 gauge, 2 conductors stranded direct burial low voltage wire will be required to run power to your
operator
. Length is deter mined by distance between transformer power supply and the control box.
A voltage meter and digital camera may be necessary to run diagnostic checks.
(4) 3/8” Red Heads, Lag Screws and Shields, or another brand column mounting 3/8” bolt and anchor
will be needed to connect the Base Plate to the column
.
(2)
-
5/16” Hex bolts will be needed to connect the Gate Mounting Bracket to the gate
. Length will be
determined by the gate horizontal member distance.
If your transformer is going to be plugged into an outdoor outlet you will need to weatherproof that outlet and
transformer.
Electrical boxes or plug covers
can be obtained from a local hardware store to accommodate
both the plug and transformer.
Hardware to attach the control box to a post or fence.
1.4
Содержание E-SC 400
Страница 4: ...Section 1 Review of Specifications Warnings and Tools...
Страница 5: ......
Страница 10: ...Section 2 Manual Operation and Installation...
Страница 11: ......
Страница 18: ...Section 3 Wiring Jumpers Receiver...
Страница 19: ......
Страница 26: ...Section 4 Start Up and Operation...
Страница 27: ......
Страница 33: ...Section 5 Troubleshooting and Accessories...
Страница 34: ......