E-SC 400 / 402 Classic Series Instruction Manual
Control Box and Running Wires
3.1
Control Box Mounting:
The control box can be mounted on a post or fence line.
If you have a dual operator set up, make sure it is located within 45’ of the slave motor.
Allow at least 3 feet of clearance off the ground.
Wiring:
Cut to fit the proper water tight connector ring for your wire(s).
Fill in any visible gaps with caulk.
Connecting wires for the slave operator (if applicable):
You will need a second watertight junction box mounted. This item can be found at any hardware store.
Use a bus connector (seen below) to connect the operator pigtail to the wire, which will go under the driveway.
See the next page for instructions on running wire under the driveway. (Applicable for dual gate operation)
It is important that all wires are
constricted into the water tight
connector.
!
Содержание E-SC 400
Страница 4: ...Section 1 Review of Specifications Warnings and Tools...
Страница 5: ......
Страница 10: ...Section 2 Manual Operation and Installation...
Страница 11: ......
Страница 18: ...Section 3 Wiring Jumpers Receiver...
Страница 19: ......
Страница 26: ...Section 4 Start Up and Operation...
Страница 27: ......
Страница 33: ...Section 5 Troubleshooting and Accessories...
Страница 34: ......