E-SC 400 / 402 Classic Series Instruction Manual
Troubleshooting
The gate opener is not stopping on the limit switches
Remove all pre
-
installed jumpers from the limit switch terminals that have limits going to them. The slave
gate terminals come pre
-
jumped for single operation, if you are using a dual system, pay particular attention
to this detail and remove the jumpers when you put your limit switches in.
The limits are wired incorrectly
-
be sure that you are following the correct wiring diagram.
For dual gates, check that the delay between leafs is 2 or above. If both limits are triggered simultaneously,
there is a chance a limit could be missed.
One or both arms are not moving
Check to be sure wiring color pattern matches the installation (Example: push to open wiring for a push to
open installation)
-
If the limits or motor are wiring opposite the installation, the board will believe it is
closed or open when it is actually the opposite and the arms will never move.
Check the limit wires are inserted correctly in the terminal blocks. The terminal blocks come with the termi-
nal clamps closed
-
however, when the terminal clamps are closed there is a small space below them one
could mistake as a place to inset a wire. If this is done then conductivity of the connection will never be
reached.
Push or pull on the gate
-
If it moves the gears are disengaged and the gate is in manual release mode.
General fix for user to understand operation.
Unlock the gate opener and move it to the half way position. Change the run time to a low number
(example: 2). Run the operator repeatedly.
The operator should run one direction for a 2 count and then the other for a 2 count. After you feel you have
it following the run time correctly and swinging level easily, then start incrementally lengthening the run
time.
Eventually the run time will allow the operator arm to reach both limit switches and your setup is complete.
Single gate
-
Arm swings in a jerky manner
The jumpers are not in place on LIMIT 2
-
all three need to be jumped together.
Dual gate
-
Only one arm moves.
If one arm reaches a limit before the other arm moves, that other arm will never move. In other
words, the second arm must move before first hits limit.
If the device you are using to activate the gate is wired into PUSH 2 that only opens leaf 1.
Check your dual settings
-
if the dip switch is changed to dual with the power on, the setting will not
take effect, turn the power off and then back on to have the dual dip switch take effect.
5.2
Содержание E-SC 400
Страница 4: ...Section 1 Review of Specifications Warnings and Tools...
Страница 5: ......
Страница 10: ...Section 2 Manual Operation and Installation...
Страница 11: ......
Страница 18: ...Section 3 Wiring Jumpers Receiver...
Страница 19: ......
Страница 26: ...Section 4 Start Up and Operation...
Страница 27: ......
Страница 33: ...Section 5 Troubleshooting and Accessories...
Страница 34: ......