E-SC 400 / 402 Classic Series Instruction Manual
Installation of Operator
2.5
9) Using the
C
measurement from the hinges, find the correct
location for your gate bracket. Mark the bracket position and
drill 5/16” holes in the horizontal bar on the gate.
Bolt the bracket to the gate.
10) Insert the 1/4” x 2” carriage bolt up from the bottom of the
bracket, so the square head of the carriage bolt fits into one of
the holes of bracket
TIP:
Most use of the center hole, which is the intend-
ed hole of usage. However there are multiple holes for
adjustment after the brackets are mounted.
11) Place a washer on top of the bracket and the end of the
curved motor arm on top of the washer.
Place a second washer on top of the motor arm and then
secure the setup in place using a lock nut. The lock nut
should be tightened to hold the bolt in the bracket but not
so tight it restricts pivoting.
12) Insert the 1/4” x 11/2” carriage bolt through the
straight motor arm so the square head fits into the square
hole of the arm.
Содержание E-SC 400
Страница 4: ...Section 1 Review of Specifications Warnings and Tools...
Страница 5: ......
Страница 10: ...Section 2 Manual Operation and Installation...
Страница 11: ......
Страница 18: ...Section 3 Wiring Jumpers Receiver...
Страница 19: ......
Страница 26: ...Section 4 Start Up and Operation...
Страница 27: ......
Страница 33: ...Section 5 Troubleshooting and Accessories...
Страница 34: ......