3. INSTALLATION INSTRUCTIONS 

FLOOR PROTECTION 

The cook stove must be placed upon a hearth or floor protector made from non-
combustible material(s). The size of the hearth or floor protector must be in line 
with national requirements, in extending at least the minimum distance to the 
front, rear and sides of the appliance, and have a total size as indicated. 

 

 

USA 

Canada 

30” 

(762mm) 

38” 

(965mm)

 

34” 

(864mm)

 

48.5” 

(1,232mm)

 

16” 

(406mm)

 

18” 

(460mm)

 

0” 

(0mm)

 

8” 

(203mm)

 

6” 

(152mm)

 

8” 

(203mm)

 

 

E* - From edge of firebox opening to outside edge of floor protection. 

WALL CLEARANCES (CLEARANCE DISTANCES) 

The  cook  stove  must  be  placed  an  appropriate  distance  from  combustible 
materials,  to  both  the  rear  and  sides.  The  Heatshield  must  be  installed  in 
conjunction with these wall clearance distances. 

 

 

 

4” 

(101mm) 

4.5” 

(114mm)

 

13.5” 

(343mm) 

7” 

(178mm)

 

 

 

Содержание BakeHeart

Страница 1: ...224WS009E All data and information contained in this report are confidential and proprietary to Esse Engineering Ltd Its significance is subject to the adequacy and representative character of the sam...

Страница 2: ...t BakeHeart Project Number 0224WS009E AUTHORIZED SIGNATORIES This report has been reviewed and approved by the following authorized signatories Evaluator __________________________ Bruce Davis Testing...

Страница 3: ...Table 5 Kindling and Start up Fuel Description Summary 8 Table 6 Fuel Measurements and Cordwood Descriptions Test 9 Table 7 Dilution Tunnel Gas Measurements and Sampling Data 9 Table 8 Test Configurat...

Страница 4: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E Section 1 Sampling Procedures and Test Results 4 of 161...

Страница 5: ...ed SAMPLING PROCEDURE The WarmHeart wood stove was tested in accordance with the U S EPA 40 CFR Part 60 Subpart AAA Standards of Performance for New Residential Wood Heaters using ASTM E2515 and EPA A...

Страница 6: ...No sampling anomalies occurred this test run was determined to be valid and appropriate for inclusion in the weighted average Run 3 Test procedures followed to produce a high burn rate with a primary...

Страница 7: ...ms per hour 1 Based on a cold start including kindling and start up fuel Table 2 Particulate Emissions First Hour Run ASTM E2515 Emissions First Hour g h 1 3 21 2 5 80 4 3 89 Table 3 B415 1 Efficiency...

Страница 8: ...ft min Before After Before After Before After 1 64 66 29 42 29 45 50 50 2 68 66 29 45 29 52 50 50 3 67 68 29 22 29 20 50 50 4 68 66 29 19 28 96 50 50 Table 5 Kindling and Start up Fuel Description Su...

Страница 9: ...y Basis lbs Test Fuel Consumed During Test Dry Basis lbs Nominal Piece Length in 1 10 5 1 09 9 6 8 56 4 21 10 5 4 11 5 2 12 6 1 09 11 6 10 3 10 3 5 11 5 3 10 8 1 09 9 9 8 65 4 53 10 8 4 11 5 4 12 6 1...

Страница 10: ...lly open then set to full closed by 12 minutes Secondary No user control for secondary air Fan N A Bypass N A Fully open for first 12 minutes then set to full closed 3 Fuel Loading Kindling and start...

Страница 11: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Section 2 Photographs Appliance Description Drawings 11 of 161...

Страница 12: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Esse Engineering Ltd WarmHeart Test Dates August 4 2020 August 5 2020 12 of 161...

Страница 13: ...l WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Esse Engineering Ltd WarmHeart Run 1 Kindling and start up fuel Run 1 Kindling and start up fuel Run 1 Ignition of kindling R...

Страница 14: ...l WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Esse Engineering Ltd WarmHeart Run 1 Test Fuel Load In Stove Run 1 Remaining Coal Bed Run 2 Test Fuel Load Run 2 Test Fuel Lo...

Страница 15: ...ring Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 3 Kindling and start up fuel Run 3 Ignition of kindling Run 3 Test Fuel Load Run 3 Test Fuel Loaded into Sto...

Страница 16: ...ering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 3 Remaining Coal After Test Run 4 Test Fuel Load Run 4 Test Fuel Loaded into Stove Run 4 Air control settin...

Страница 17: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 4 Coal bed prior to stir Run 4 Coal bed after stir Run 4 Remaining Coal After Test 17 of 161...

Страница 18: ...is directed down across the glass and into the fire chamber A lower primary air orifice is mounted on the firebox floor near the loading door Air is routed through the bottom of the firebox and into t...

Страница 19: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Section 3 Test Data by Run 19 of 161...

Страница 20: ...0 0 10 0 2 177 0 36 0 2 160 0 11 7 5 429 0 37 5 5 405 0 12 2 1 327 0 38 1 8 251 0 13 0 9 253 0 39 1 1 206 0 14 0 4 220 0 40 0 5 186 0 15 0 1 201 0 41 0 0 173 0 16 5 5 452 0 42 5 8 399 0 17 1 4 276 0 4...

Страница 21: ...Fuel The start up fuel consists of 10 pieces at 10 5 of equal size A total weight of 2 6lbs 0 5lbs Test Fuel The test fuel consists of four pieces with a nominal length of 11 5 Follow the fuel sheet g...

Страница 22: ...oor wide open for one and a half to three minutes The amount of time for the door is to be based on how involved the fuel is The test load should be loaded at the bottom end of the allowable coal bed...

Страница 23: ...re five pieces in total The nominal length is 11 5 Coal Bed The coal bed will always result in running a high burn There may be large pieces of fuel left after the high burn as soon as the high burn h...

Страница 24: ...ree pieces at 10 5 on top going East West on the top Make sure there are gaps between the fuel and secondary tubes The door is to be be wide open for two to four minutes Keep the primary control open...

Страница 25: ...use with ASTM E3053 17 Moving Fuel Load It may be necessary to move the fuel load at some point during the medium and low burns Keep an eye on weight drop and stack draft to determine when to move the...

Страница 26: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 1 High Burn 1 minute data Emissions Results Cold to Hot Cycle 26 of 161...

Страница 27: ...68 1 77 62 0 1 78 0 100 96 95 3 9 0 1 200 60 77 87 79 101 299 80 49 65 0 055 11 0 47 14 2 253 2 378 0 16 0 17 2 27 63 1 65 1 77 62 0 80 0 100 96 95 3 7 0 2 229 61 80 92 82 109 330 80 49 65 0 058 11 4...

Страница 28: ...4 0 2 583 106 250 314 276 306 467 86 50 64 0 077 14 24 0 69 48 7 740 8 152 0 16 0 17 2 21 67 4 12 1 74 65 0 7 96 0 090 101 101 8 2 0 2 595 108 253 318 279 311 467 86 50 64 0 077 14 07 0 6 49 7 900 8 3...

Страница 29: ...32 0 81 80 12 898 13 548 0 16 0 17 2 27 69 1 96 1 77 66 9 7 97 0 090 102 102 3 0 0 16 762 160 351 459 389 424 470 81 54 65 0 077 15 2 0 82 81 13 061 13 719 0 16 0 17 2 27 69 2 09 1 77 66 9 7 97 0 090...

Страница 30: ...are mg Particulate mg A Front filter catch Filter T288BP 197 5 193 4 4 1 B Rear filter catch Filter 0 0 C Probe catch Probe 17 114563 9 114562 9 1 0 D Filter seals catch Seals S062 3324 6 3324 2 0 4 T...

Страница 31: ...Emissions 0 31 grams 0 31 grams Complete Test Run Total Particulate Emissions ET 7 33 grams Particulate Emission Rate 4 44 grams hour Emissions Factor 1 54 grams kg First Hour Emissions Total Particul...

Страница 32: ...6 397 15 554 Btu h Burn Rate kg h 1 15 2 54 lb h Input kJ h 23 007 21 825 Btu h Test Load Weight dry kg 1 90 4 19 dry lb MC wet 16 21983914 MC dry 19 36 Particulate g 4 44 CO g 151 Test Duration h 1 6...

Страница 33: ...8 5 Core of Total Wt 64 In Range 45 65 Total Test Load Weight dry basis 8 56 lb 3 88 kg Remainder of Total Wt 36 In Range 35 55 Actual Load of Nominal Target 96 In Range 95 105 Kindling Moisture dry b...

Страница 34: ...34 of 161...

Страница 35: ...35 of 161...

Страница 36: ...ng Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 1 High Burn 1 minute data Efficiency and Heat Output Results Kindling and start up fuel removed from calculati...

Страница 37: ...7 13 96 0 7 7 7 7 555 102 240 307 270 295 468 86 49 64 0 078 14 24 0 69 8 7 6 570 104 244 310 273 300 469 86 49 64 0 077 14 26 0 69 9 7 4 583 106 250 314 276 306 467 86 50 64 0 077 14 24 0 69 10 7 2 5...

Страница 38: ...tal Sampling Time Project No Export to 36 3 0 737 150 333 439 366 405 474 81 53 65 0 077 15 21 0 99 37 2 8 741 151 337 443 371 409 478 81 53 64 0 079 15 21 0 95 38 2 7 748 153 339 446 374 412 481 81 5...

Страница 39: ...ms DIV 0 grams DIV 0 grams Particulate Emission Rate DIV 0 grams hour DIV 0 grams hour DIV 0 grams hour DIV 0 grams hour Emissions Factor DIV 0 g kg DIV 0 g kg DIV 0 g kg Difference from Average Total...

Страница 40: ...323 48 685 Btu h Burn Rate kg h 3 46 7 62 lb h Input kJ h 69 013 65 466 Btu h Test Load Weight dry kg 3 51 7 74 dry lb MC wet 18 5004075 MC dry 22 70 Particulate g DIV 0 CO g 196 Test Duration h 1 02...

Страница 41: ...8 5 Core of Total Wt 64 In Range 45 65 Total Test Load Weight dry basis 8 56 lb 3 88 kg Remainder of Total Wt 36 In Range 35 55 Actual Load of Nominal Target 96 In Range 95 105 Kindling Moisture dry b...

Страница 42: ...42 of 161...

Страница 43: ...43 of 161...

Страница 44: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 2 Low Burn 44 of 161...

Страница 45: ...040 0 17 0 17 2 30 74 2 11 1 78 70 0 3 87 0 100 100 100 5 0 0 6 608 184 315 437 408 390 300 82 58 81 55 71 0 054 12 75 2 36 70 11 458 11 893 0 16 0 17 2 31 74 2 05 1 76 71 0 3 87 0 100 100 99 4 4 0 6...

Страница 46: ...370 356 301 149 82 60 80 59 67 0 017 5 98 0 44 240 39 466 41 075 0 16 0 17 2 28 74 1 56 1 81 71 0 6 72 0 100 99 99 0 9 0 04 294 177 302 367 354 299 148 81 60 79 59 67 0 017 5 99 0 46 245 40 286 41 938...

Страница 47: ...Firebox Back Firebox Left Firebox Right Avg Stove Surface Stack Filter 1 Dryer Exit 1 Filter 2 Dryer Exit 2 Ambient Draft H2O CO2 CO Wood Heater Test Data ASTM E3053 ASTM E2515 Test Date Stack Gas Da...

Страница 48: ...ple Component Reagent Filter Probe Weights or Dish Final mg Tare mg Particulate mg A Front filter catch Filter T289BP 197 4 190 1 7 3 B Rear filter catch Filter 0 0 C Probe catch Probe 31 114365 2 114...

Страница 49: ...s hour 1 78 grams hour 1 93 grams hour 5 80 grams hour Emissions Factor 2 44 g kg 2 65 g kg 2 23 g kg Difference from Average Total Particulate Emissions 0 50 grams 0 50 grams Complete Test Run Total...

Страница 50: ...10 486 Btu h Burn Rate kg h 0 73 1 61 lb h Input kJ h 14 562 13 814 Btu h Test Load Weight dry kg 4 68 10 31 dry lb MC wet 18 16693944 MC dry 22 20 Particulate g 1 85 CO g 526 Test Duration h 6 42 Emi...

Страница 51: ...r 3 Pcs 2 2 90 lb In Range 24 2 18 1 23 21 8 In Range 2 38 lb 1 08 kg 3 lb NA NA NA NA lb NA kg Remainder Load Piece Weight Ratio Small Large 62 In Range 67 Total Load Ave MC dry basis 22 2 In Range R...

Страница 52: ...52 of 161...

Страница 53: ...53 of 161...

Страница 54: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 3 High Burn 1 minute data Non Sampling 54 of 161...

Страница 55: ...3 68 68 67 84 268 67 0 044 7 4 6 174 63 69 69 68 89 285 67 0 050 8 4 5 196 63 70 71 69 94 311 67 0 055 9 4 3 217 63 72 73 71 99 324 67 0 054 10 4 2 236 63 75 77 74 105 332 67 0 054 11 4 1 252 63 78 81...

Страница 56: ...Project No 36 1 6 442 83 190 263 230 242 330 67 0 053 37 1 5 442 85 196 269 237 246 326 67 0 053 38 1 4 440 87 201 275 244 249 324 67 0 053 39 1 4 441 88 206 281 252 254 322 67 0 053 40 10 8 437 91 2...

Страница 57: ...75 4 3 762 148 331 434 362 407 486 67 0 077 76 4 2 768 150 333 438 366 411 486 67 0 077 77 4 0 769 151 337 441 370 414 484 67 0 077 78 3 9 769 153 339 445 375 416 480 68 0 075 79 3 8 770 154 342 448...

Страница 58: ...tal Particulate Emissions DIV 0 grams DIV 0 grams Complete Test Run Total Particulate Emissions ET DIV 0 grams Particulate Emission Rate DIV 0 grams hour Emissions Factor DIV 0 grams kg First Hour Emi...

Страница 59: ...Core of Total Wt 63 In Range 45 65 Total Test Load Weight dry basis 8 65 lb 3 92 kg Remainder of Total Wt 37 In Range 35 55 Actual Load of Nominal Target 99 In Range 95 105 Kindling Moisture dry basi...

Страница 60: ...60 of 161...

Страница 61: ...61 of 161...

Страница 62: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Run 4 Low Burn 62 of 161...

Страница 63: ...0 16 0 17 2 28 72 1 57 1 76 69 0 84 0 100 95 97 6 4 0 5 609 177 294 394 388 372 314 80 69 84 70 68 0 055 12 04 0 89 70 11 450 11 958 0 16 0 17 2 25 72 1 58 1 75 69 0 2 86 0 090 103 102 5 9 0 5 621 175...

Страница 64: ...74 0 090 101 102 1 2 0 316 195 309 408 366 319 160 82 68 81 68 68 0 018 3 05 0 25 240 39 354 41 322 0 16 0 17 2 26 73 1 78 1 80 69 0 74 0 090 102 102 1 2 0 312 194 306 402 361 315 158 81 68 80 68 68 0...

Страница 65: ...t H2O CO2 CO Wood Heater Test Data ASTM E3053 ASTM E2515 Test Date Stack Gas Data Fuel Weight lb Temperature Data F Velocity Traverse Data Manufacturer Model Tracking No Total Sampling Time Project No...

Страница 66: ...8 B Rear filter catch Filter 0 0 C Probe catch Probe 29 114277 8 114276 5 1 3 D Filter seals catch Seals S066 3585 0 3584 3 0 7 Total Particulate mg 6 8 AMBIENT Sample Component Reagent Filter or Weig...

Страница 67: ...s 0 39 grams 0 39 grams Complete Test Run Total Particulate Emissions ET 8 58 grams Particulate Emission Rate 1 30 grams hour Emissions Factor 1 85 grams kg First Hour Emissions Total Particulate Emis...

Страница 68: ...10 001 Btu h Burn Rate kg h 0 70 1 54 lb h Input kJ h 13 976 13 258 Btu h Test Load Weight dry kg 4 61 10 15 dry lb MC wet 19 41982272 MC dry 24 10 Particulate g 8 58 CO g 382 Test Duration h 6 58 Emi...

Страница 69: ...cs 2 1 40 lb In Range 19 4 19 2 20 1 19 6 In Range 1 17 lb 0 53 kg 3 lb NA NA NA NA lb NA kg Remainder Load Piece Weight Ratio Small Large 42 In Range 67 Total Load Ave MC dry basis 24 1 In Range Rema...

Страница 70: ...70 of 161...

Страница 71: ...71 of 161...

Страница 72: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Section 4 Quality Assurance Quality Control 72 of 161...

Страница 73: ...orm product safety testing as a Certification Organization by the Standards Council of Canada SCC Serving as a testing laboratory for the certification of wood heaters by the U S Environmental Protect...

Страница 74: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Sample Analysis Analysis Worksheets Tared Filter Probe and O Ring Data 74 of 161...

Страница 75: ...75 of 161...

Страница 76: ...76 of 161...

Страница 77: ...77 of 161...

Страница 78: ...78 of 161...

Страница 79: ...79 of 161...

Страница 80: ...80 of 161...

Страница 81: ...81 of 161...

Страница 82: ...82 of 161...

Страница 83: ...83 of 161...

Страница 84: ...tificate 283A Audit Weights Troemner 21pc Mass Set Calibration Certificate 371 Sample Box Dry Gas Meter Apex Automated Emissions Sampling Box Calibration Log 372 Sample Box Dry Gas Meter Apex Automate...

Страница 85: ...85 of 161...

Страница 86: ...86 of 161...

Страница 87: ...87 of 161...

Страница 88: ...eters Run 1 Run 2 Run 3 Reference Meter Pressure H2O Pr 0 00 0 00 0 00 DGM Pressure H2O Pd 2 20 0 92 3 20 Initial Reference Meter 470 757 476 852 484 075 Final Reference Meter 475 9 481 838 489 442 In...

Страница 89: ...Acceptable tolerance is 4 The uncertainty of measurement is 0 4 WC This is based on the reference standard having a TAR Test Accuracy Ratio of at least 4 1 Technician signature Date Reviewed by Date R...

Страница 90: ...1 1 1 100 99 99 99 99 99 99 99 300 299 299 299 299 299 299 299 500 499 499 499 499 499 499 499 700 699 699 699 699 699 699 699 1000 999 999 999 999 999 999 999 1500 1499 1499 1499 1499 1499 1499 1499...

Страница 91: ...meters Run 1 Run 2 Run 3 Reference Meter Pressure H2O Pr 0 00 0 00 0 00 DGM Pressure H2O Pd 1 70 2 58 0 70 Initial Reference Meter 490 143 495 912 503 601 Final Reference Meter 495 2 500 943 508 881 I...

Страница 92: ...Acceptable tolerance is 4 The uncertainty of measurement is 0 4 WC This is based on the reference standard having a TAR Test Accuracy Ratio of at least 4 1 Technician signature Date Reviewed by Date R...

Страница 93: ...1 1 100 99 99 99 99 99 99 99 300 299 299 299 299 299 299 299 500 499 499 499 499 499 499 499 700 699 699 699 699 699 699 699 1000 999 999 999 999 999 999 999 1500 1499 1499 1499 1499 1499 1499 1499 2...

Страница 94: ...94 of 161...

Страница 95: ...Inch 5 7E 04 0 8700 0 870 0 000 0 869 0 871 Inch Inch 5 7E 04 1 0000 1 000 0 000 0 999 1 001 Inch Remarks Many factors may cause the unit to drift out of calibration before the recommended due date An...

Страница 96: ...96 of 161...

Страница 97: ...97 of 161...

Страница 98: ...E Z R E Z R E Z R E NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 0 NDIR 02 2 2 2 2 2 2 2 2 2 2 2 1312 West Grove Avenue Orange CA 92865 4134 Phone 714 974 5560 Fax 714 92...

Страница 99: ...0002 89 9995 90 0005 g g 3E 04 120 00000 120 0001 0 0001 119 9995 120 0005 g Remarks Many factors may cause the unit to drift out of calibration before the recommended due date Any reported error is...

Страница 100: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Example Calculations 100 of 161...

Страница 101: ...standard conditions g dscf ET Total particulate emissions g PR Proportional rate variation PMR Particulate emissions for test run g hr PMF Particulate emission factor for test run g dry kg of fuel bu...

Страница 102: ...es Inc BR dry burn rate kg hr ASTM E2780 equation 5 60 MFTAdb Where Total length of test run min Sample Calculation MBdb 4 68 kg 385 min 60 x 4 68 BR 0 73 BR 385 kg hr BR Control No P SSAR 0003 Low Bu...

Страница 103: ...tic pressure of tunnel in H20 in Hg in H20 13 6 Ms The dilution tunnel wet molecular weight Ms 28 78 assuming a dry weight of 29 lb lb mole Sample calculation 19 88 20 82 76 8 1 2 Vs 0 955 x 85 49 x 0...

Страница 104: ...area of dilution tunnel ft2 Tstd Standard absolute temperature 528 R Ps Absolute average gas static pressure in dilution tunnel Pbar Pg in Hg Ts avg Absolute average gas temperature in the dilution tu...

Страница 105: ...te in Hg H Average pressure differential across the orifice meter in H2O Tm Absolute average dry gas meter temperature R Sample Calculation Using equation for Train 1 2 30 Vm std 17 64 x 63 266 x 0 99...

Страница 106: ...rom filters mg mg mass of particulate matter from filter seals mg Sample Calculation Using equation for Train 1 first hour mn 0 0 4 1 0 0 mn 4 1 mg Using equation for Train 1 post first hour mn 0 6 3...

Страница 107: ...mn Total mass of particulate matter collected in the sampling train mg Vm std Volume of gas sampled corrected to dry standard conditions dscf Sample calculation For Train 1 8 1 61 73 Cs 0 00013 g dsc...

Страница 108: ...gas flow rate dscf hr Total time of test run minutes Sample calculation For Train 1 ET 0 000131 0 x 13535 7 x 385 60 ET 11 40 g For Train 2 ET 0 000143 0 x 13535 7 x 385 60 ET 12 39 g Average E 11 89...

Страница 109: ...e gas velocity in the dilution tunnel ft sec Tmi Absolute average dry gas meter temperature during the ith time interval o R Tm Absolute average dry gas meter temperature o R Tsi Absolute average gas...

Страница 110: ...g hr ASTM E2780 equation 6 PMR 60 ET Where ET Total particulate emissions grams Total length of full integrated test run min Sample Calculation ET Dual train average 11 89 g 385 min PMR 60 x 11 89 38...

Страница 111: ...culate emission factor for test run g dry kg of fuel burned ASTM E2780 equation 7 PMF ET MFTAdb Sample Calculation ET Dual train average 11 89 g MBdb 4 68 kg PMF 11 89 4 68 PMF 2 54 g kg Control No P...

Страница 112: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Section 5 Labeling Owner s Manual 112 of 161...

Страница 113: ......

Страница 114: ...Bakeheart and Warmheart Wood Fired Cook Stove Owner s Manual OMNI Test Laboratories Inc 0224WS009S 0224WS009E...

Страница 115: ...CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA THIS ROOM HEATER MUST BE CONNECTED TO A CHIMNEY COMPLYING WITH THE REQUIREMENTS FOR TY...

Страница 116: ...LIGHTING YOUR ESSE COOK STOVE 11 REFUELLING 13 EMPTYING THE FIREBOX OF EXCESS ASH 13 COOKING ON YOUR COOK STOVE 14 REDUCED BURNING 17 FLUE DRAFT 17 CLEANING MAINTENANCE 17 REPLACING THE FIRE BRICKS 2...

Страница 117: ...4 CHIMNEY FLUE 29 CHIMNEY HEIGHT 34 POSITIONING WITHIN A MASONRY FIREPLACE 35 FLOOR PROTECTION 36 WALL CLEARANCES CLEARANCE DISTANCES 36 FLUE DRAFT 37 COMMISSIONING 37 4 CONSUMABLE PARTS 39...

Страница 118: ...of this manual and that the flue and chimney has been swept The cook stove is not suitable for use in a shared flue As you would expect when in use all parts of the stove become hot so always use the...

Страница 119: ...ng wood only An extractor should not be fitted within the same room as the appliance Do not place tea towels or similar items on the handrail GETTING TO KNOW YOUR COOK STOVE Air Controller This is use...

Страница 120: ...0 counter clockwise Please note when in use both of these catches will become hot so always use the supplied operating tool or glove to open and close them The operating tool or glove should also be u...

Страница 121: ...Brush For cleaning ovens hotplate Firebox Shelf For cooking direct onto embers Oven Shelf For cooking within the oven Fireshield To direct heat away whilst cooking Please keep all of these items in a...

Страница 122: ...e information see the Ventilation section within the Installation part of this manual FUEL Your ESSE stove has been designed to burn wood logs of appropriate quality and moisture content Approved fuel...

Страница 123: ...h a moisture detector or purchasing it from a reputable fire wood specialist who is able to control the moisture content of their wood logs Your wood should be stacked safely so as to not allow absorp...

Страница 124: ...x through a series of holes in two pipes located at the top of the firebox The amount of Tertiary Air is not adjustable but carefully positioned to help achieve improved efficiency and a clean burn Pi...

Страница 125: ...flue and chimney Whilst lighting the fire do not leave your ESSE cook stove unattended until the fire is established the door is fully closed and you have adjusted the Air Controller to the appropria...

Страница 126: ...lling should be undertaken whilst the flames on the current fuel are still established or you may experience excessive smoking If the current fire has died out reignite the fire with additional kindli...

Страница 127: ...ate for cooking or keeping hot beverages soups or stews warm The Oven Bakeheart only When in use the oven is heated through heat transfer from the fire providing all round heat for perfect cooking As...

Страница 128: ...ive graduated areas of heat The centre of the hotplate is positioned directly above the firebox so will be the hottest area and is perfect for boiling whilst the outer areas are ideal for simmering To...

Страница 129: ...s warm Once up to temperature relatively small amounts of fuel are required to keep the cooking areas hot With this in mind resist the temptation to add excessive amounts of fuel to the firebox which...

Страница 130: ...lation your installer should have taken a flue draft reading to ensure that it within the recommended range of 12 25 Pascals If your cook stove is burning wood logs quickly or adjusting the Air Contro...

Страница 131: ...result creosote residue accumulates on the flue lining When ignited this creosote makes an extremely hot fire The chimney connector and chimney should be inspected at least once every two months duri...

Страница 132: ...Do not use aggressive chemical cleaners as these can dull the finish Do not use aggressive scouring pads or brushes as this can scratch the surface Exterior painted surfaces The exterior of the cook...

Страница 133: ...KS During the life of your cook stove the vermiculite firebricks will need replacing The part numbers are shown in the Consumable Parts section of this document The bottom and rear bricks can be repla...

Страница 134: ...front of the cook stove 3 Remove the steel baffle and baffle insulation through the front of the cook stove 4 Remove the side panel by unscrewing the three screws at the rear of the cook stove and the...

Страница 135: ...G THE FIRE GLASS During the life of your cook stove the fire door glass may need replacing Do not use the appliance if there is any sign of damage to the glass Care should be taken when replacing the...

Страница 136: ...e a year typically before the stove season Where the appliance is used throughout the year we recommend more regular sweeping SAFE SHUTDOWN In the unlikely event of a chimney fire a fault occurring wi...

Страница 137: ...arranty registration and receive a warranty upgrade to five years The warranty must be registered within 1 month of installation to qualify for the 5 year warranty The conditions of your warranty are...

Страница 138: ...heck and remove any blockage Downdraft in flue Consult with your installer to add flue cowl or other solution Fire will not light Too little combustion air Increase the setting of the air controller W...

Страница 139: ...appropriate access is provided for cleaning of the appliance flue pipe and chimney flue This appliance is suitable for intermittent operation but is not suitable for use in a shared flue system The ap...

Страница 140: ...27 3 INSTALLATION INSTRUCTIONS INSTALLING THE HEATSHIELD Unit is supplied with a heat shield that is to be mounted to the wall BAKEHEART HEATSHIELD I BH 100 005US WARMHEART HEATSHIELD I WH 100 005US...

Страница 141: ...28 3 INSTALLATION INSTRUCTIONS PRODUCT SPECIFICATION BAKEHEART WARMHEART ESSE cook stoves are hand crafted so small variations in size can occur...

Страница 142: ...KING THE APPLIANCE The cook stove comes bolted and strapped to a pallet for simple and secure transportation To unpack first remove the strapping and packaging Then remove the two bolts holding the st...

Страница 143: ...t as detailed within the Flue Draft section of this manual Take into consideration future access for maintenance and sweeping The flue must be capped have a cowl to prevent any ingress of rain A singl...

Страница 144: ...tible wall Method A Using a minimum thickness 3 5 90mm brick and a 5 8 16mm minimum wall thickness clay liner construct a wall pass through The clay liner must conform to ASTM C315 Standard Specificat...

Страница 145: ...l combustibles Use sheet metal supports fastened securely to wall surfaces on all sides to maintain the 9 229mm air space When fastening supports to chimney length do not penetrate the chimney liner t...

Страница 146: ...hold the metal chimney connector See that the supports are fastened securely to wall surfaces on all sides Make sure fasteners used to secure the metal chimney connector do not penetrate the chimney f...

Страница 147: ...r flue liner face A chimney connector shall not pass through an attic or roof space closet or similar concealed space floor or ceiling CHIMNEY HEIGHT A masonry chimney or a listed factory built chimne...

Страница 148: ...Where a mantelpiece or beam of combustible material such as wood is used in the fireplace it should be a minimum of 36 920mm from the appliance In some situations it may be necessary to shield the bea...

Страница 149: ...s of the appliance and have a total size as indicated USA Canada A 30 762mm 38 965mm B 34 864mm 48 5 1 232mm C 16 406mm 18 460mm D 0 0mm 8 203mm E 6 152mm 8 203mm E From edge of firebox opening to out...

Страница 150: ...ue to allow for a flue draft reading to be taken When both the cook stove and chimney are warm a reading in a range between 1 25mm wg 12 Pa and 2 5mm wg 25 Pa should be expected Any readings significa...

Страница 151: ...Installing engineer information Name Address Telephone number Commissioning checks To be completed signed for Flue draft reading taken and recorded Insert reading here Flue chimney setup appropriate Y...

Страница 152: ...4 I WH 100 008US Rear RHS Brick 10 Glass Rope 2 5 I WH 100 108US Bottom Brick 11 500 IH 117 Ceramic Glass 6 I WH 100 109US Rear Brick 12 Glass Rope 1 The Bolster Lid Rope Seals will also need replacin...

Страница 153: ...ESSE Engineering Ltd Long lng Barnoldswick Lancashire BB18 6BJ UK Tel 01282 813 235 Fax 01282 816 876 Website www esse com...

Страница 154: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Appendix A Alt 125 E3053 Letter...

Страница 155: ...proval to use the procedures and specifications found in ASTM Method E3053 17 a cord wood test method titled Standard Test Method for Determining Particulate Matter Emissions from Wood Heaters using C...

Страница 156: ...The filter temperature must be maintained between 80 and 90 degrees F during testing 2 Filters must be weighed in pairs to reduce weighing error propagation see ASTM 2515 11 Section 10 2 1 Analytical...

Страница 157: ...regarding this approval please contact Michael Toney of my staff at 919 541 5247 or toney mike epa gov cc Amanda Aldridge EPA OAQPS OID Adam Baumgart Getz EPA OAQPS OID Rafael Sanchez EPA OECA Michae...

Страница 158: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Appendix B Firebox Volume...

Страница 159: ......

Страница 160: ...Esse Engineering Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Appendix C Revision History Table...

Страница 161: ...ing Ltd Model WarmHeart BakeHeart Project Number 0224WS009E OMNI Test Laboratories Inc Date Project No Tech Evaluator Report Sect Summary of Changes 4 27 21 0224WS009E Bruce Davis All Original Report...

Отзывы: