8
Kongsberg X-series
From the
Vacuum Zone
setup – dialog, configure a suitable vacuum area for the job.
Select
Vacuum Zones
that corresponds to the outline of your material.
Proper selection is important to achieve the best possible material hold down.
8.8.
Job Execution
Before execution, check this:
1
Verify that
Opened Job
is ready for production.
2
Verify that the
Table View
display of the
Job
is reasonable.
3
Press
Pause
to reset
Safety System
.
4
Complete a
Table Top Reference
sequence to update
Tool Height
measurement.
5
Position the material on the
Cutting Table
.
6
Press
Vacuum On
to start the
Vacuum Pump
.
(If you are running with
Automatic Vacuum Control
enabled, the pump will start
automatically when
Start
is pressed)
7
Press
Start
to execute the
Job
.
8.9. Milling Production
Before execution, check vacuum cleaner:
43