background image

INSTALLATION TIMELINE

1.

Prior to anchor system and goal assembly,  call utility services for location of underground utility lines before you dig.

2.

Vertical main post assembly is a two part process.

ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)

Before digging hole for anchor system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.

PART 1

Day 1.

Complete Anchor System Installation Instructions.
(Below)

Day 2-4.

Allow concrete to cure.

PART 2

Day 5.

Complete Goalrilla

TM

assembly instructions. (Requires

four adults)

Figure 1

Figure 2

Note: Using a concrete form for the top 4" of the concrete
is recommended. Cardboard forms can be purchased at
some hardware and home stores or a wooden form can
be constructed out of 2 x 4's.

3.

Mix and pour concrete into hole. Follow instructions on
concrete bag. Stop about 18" below court level.

4.

Insert four reinforcement bars (#40) into concrete 8" apart
creating a square in center on hole.

5.

Place form in desired location and finish pouring concrete
up to court level.

6.

Push anchor system into concrete and agitate to work out
voids in concrete. Immediately use a level to level and square
anchor plate to playing surface. Clean off any concrete that
may be on exposed threads

.

Let concrete stand for a MINIMUM of 72 hours.

2.

Assemble anchor system as follows: Thread nut (#35) to bottom
of threads on anchor bolt (#39) insert threads of anchor bolt
(#39) through hole on anchor plate (#38) and secure with nut
(#35). Repeat this step for the remaining
anchor bolts. See
Figure 2. Note:
Each

leg

of

anchor

bolts

should face the
anchor bolt to the
right. See Detail
A.

1.

Determine the location of the anchor
system. The proper location is as

close to

the court without making contact

,

as shown in Figure 1. This,
however,is a general rule.
If you need to locate the
anchor system in a location other than
this, use the following dimensions as a
guide.

Note: For best results with less vibration, anchor system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.

Overhang when adjusted to 10 ft. = 31

Note: The bottom four nuts will be forever embedded in
concrete.  The top four nuts remain on bolts and are 
used for leveling.  (See Step 11 on page 9)

THESE NUTS 

USED FOR 

LEVELING

OVERHANG

18 INCH

MINIMUM

REAR

CLEARANCE

REQUIRED

Note: When digging hole, if you hit rock 
and cannot dig through contact a contractor.

Note: Failure to dig and fill hole as instructed will result 
in increased system vibration.

*Tip: It is always a good idea to purchase one or two 

extra bags of concrete, just in case you need them.  If 
extra bags are not used you can return them to the store.

Items needed for Anchor Installation (not included)

11 - 80 lb. bags of concrete (2-3 extra recommended)
1 - post hole digger (optional)
1 - 15/16” open end wrench
1 - 15/16” socket and ratchet (optional)

1 - wheel barrow
1 - garden hose
1 - level
1 - tape measure

1 - concrete form (see note after step 2)

5

Содержание GOALRILLA CV B3222W

Страница 1: ...er service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Toll Free E mail basketball escaladesports com Mailing Address Escalade Sports PO Box 889 Evansville IN 47706 Please visit ou...

Страница 2: ...2...

Страница 3: ...2 1 2 Pull Pin 1 Piece 41 Hardware located in 4A 7081 00 box 14 5 1 2 X 1 1 4 Dia Plastic Washer 4 Pieces 1 Piece Hex Bolt 1 2 13 x 10 1 2 13 x 10 Hex Bolt 1 Piece 51 14mm ID X 28mm OD Dia Washer 8 P...

Страница 4: ...shing 2 pieces 25 4 pieces 3 8 X 19mm Flat Washer 5 1 2 X 1 1 4 Dia Plastic Washer 18 Pieces 3 Piece Hex Bolt 1 2 13 x 11 1 2 13 x 11 Hex Bolt 3 Piece 1 2 13 X 1 3 4 Hex Bolt 2 Pieces 50 1 2 13 X 2 1...

Страница 5: ...ead nut 35 to bottom of threads on anchor bolt 39 insert threads of anchor bolt 39 through hole on anchor plate 38 and secure with nut 35 Repeat this step for the remaining anchor bolts See Figure 2 N...

Страница 6: ...le 2 It may be necessary to use a rubber mallet to tap cap in 1 Attach Post Brackets 48 to outside of brackets on back of Post Assembly 2 Secure with two Hex Head Bolts 25 four Flat Head Washers 26 an...

Страница 7: ...to Pole 2 as shown in Figure 5 using a bolt 8 two flatwashers 3 four plastic washers 5 and thin locknut 4 Note make sure Goalrilla lettering is right side up Do NOT tighten bolt 8 at this time 5 Secu...

Страница 8: ...Figure 7 Using a bolt 7 two flatwashers 3 four plastic washers 5 and hex nut 4 If the two Tube Plugs 9 are not already installed insert them into open ends of Upper Arms 6L and 6R It may be necessary...

Страница 9: ...E ADULTS POLE WILL WANT TO LEAN WHILE ATTEMPTING TO STAND IT UP ON ANCHOR BOLTS Push on Thread Protector Cap 34 until it is securely in place Cap may be tight push hard but DO NOT hit with a hammer Se...

Страница 10: ...16 Line up hole in shaft with hole in Actuator Handle and insert Pull Pin 41 to secure Toaid in the assembly of the backboard lower the lower board arm 11 by turning the Actuator Crank until the lowe...

Страница 11: ...n these bolts Note If the Step Bushing 22 and Board Bushing 33 are not already pre installed follow step 15 and 16 18 Attach Upper Board Arms to the inside of upper mounting brackets on the backboard...

Страница 12: ...r adult attach the Cross brace 52 with four Bolts 50 eight Washers 51 and four Nuts 4 as shown in Figure 12 and Detail C Make sure that drain holes are on the bottom side of the Cross Brace Tighten al...

Страница 13: ...Pad 53 into the 44 pad and insert screw 12 to the pre drilled holes to hold pad in place Do not tighten all the way Attach Left Board Pad 45 and secure it by screwing the top 12 screw all the way in N...

Страница 14: ...e Figure 15 28 Two adults are recommended for this step one to level and one to adjust the bottom 35 nuts If further leveling is required loosen top 35 nuts but do not loosen past the top of 39 J Bolt...

Страница 15: ...height decal on backside of steel actuator 16 and line up the 10 ft mark on the tape with the 10 ft mark on the height decal Decal should fit correctly onto the backside of the steel actuator If not...

Страница 16: ...er than workmanship T orn back plates damaged springs bent rings damaged eye bolts and torn or distorted rim supports result from hanging on the rim and are not warranted The goal should not be cranke...

Страница 17: ...ons or liability on the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty s...

Страница 18: ...1 1 1 1 1 2 13 X 10 Hex Bolt Grade 5 1 2 13 X 11 Hex Bolt Grade 5 1 X 2 T ube Plug 1 9 16 X3 5 32 T ube Plug Lower Board Arm 10 X 1 3 4 Phil Hex Head Screw Actuator Cap Pivot Tube Actuator Sleeve Act...

Страница 19: ...2L 7249 03 1 12 12 12 45 44 Right Left 53 Middle 46 19 18 3 5 48 25 26 48 25 5 3 18 19 26 24 26 26 24 12 4 4 4 6R 6L 50 51 4 51 52 19...

Отзывы: