5. General Maintenance
96
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15
5. General Maintenance
This chapter describes maintenance inspections and procedures. Performing
maintenance inspections and procedures properly is essential for preventing trouble
and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
5.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual,
and annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection
points must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours
operation.
Inspection Point
Daily
Monthly
Quarterly
Biannual
Annual
Overhaul
(replacement)
1 month (250 h)
Ins
pect
ev
er
y d
ay
√
2 months (500 h)
√
3 months (750 h)
√
√
4 months (1000 h)
√
5 months (1250 h)
√
6 months (1500 h)
√
√
√
7 months (1750 h)
√
8 months (2000 h)
√
9 months (2250 h)
√
√
10 months (2500 h)
√
11 months (2750 h)
√
12 months (3000 h)
√
√
√
√
13 months (3250 h)
√
…
…
…
…
…
…
20,000 h
√
h = hour
Содержание T3 Series
Страница 2: ...Robot System Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 14: ...xii Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 18: ...Table of Contents xvi Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 43: ...1 Safety Safety and Installation T VT EPSON RC 7 0 Rev 15 25 T3 D B C C C C C A T6 D B C C C C A ...
Страница 128: ...7 Directives and Norms 110 Safety and Installation T VT EPSON RC 7 0 Rev 15 ...