![Epson T3 Series Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/epson/t3-series/t3-series_safety-and-installation_110810091.webp)
2. Installation
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15
73
2.7.2 Power ON Procedure
(1)
Check the EMERGENCY connector connection.
(2)
Connect the TP bypass plug to the TP port.
(3)
Connect the power cable to the Manipulator
(4)
Connect the power cable to the power supply socket.
(5)
The PROGRAM LED blinks approximately 30 seconds after Controller starts
up normally.
If the ERROR LED is turned ON or blinking, check connection in step (1) to
(4) and turn ON the power again.
If the ERROR LED is still ON or blinking, contact the supplier in your region.
T series Manipulator
LED
(Illustration: T3-401S)
VT series Manipulator
LED
LED
Standard model, Cleanroom model
Protection model
Содержание T3 Series
Страница 2: ...Robot System Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 14: ...xii Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 18: ...Table of Contents xvi Safety and Installation T VT EPSON RC 7 0 Rev 15 ...
Страница 43: ...1 Safety Safety and Installation T VT EPSON RC 7 0 Rev 15 25 T3 D B C C C C C A T6 D B C C C C A ...
Страница 128: ...7 Directives and Norms 110 Safety and Installation T VT EPSON RC 7 0 Rev 15 ...