background image

22

epoke

®

SKE8-12-15-20
GB-0305.1

7.1.20 Tyre list

Mashine

Ident.

Torque moment

type

no:

kpm

Size of tyre

Ply

Profile

Epoke no:

bar

psi

TKG12

1101

TKB9-280

1107

3.00-4"

6

T-991 impl.

82251314

7

101,5

TK12E

1210

14

6.00-9"

10

T-523

82251114

8,5

123,25

TK12E-275 1211

14

6.00-9"

12

T-523 

HS

82251505

10

145

TKEB12

1301

14

6.00-9"

12

T-523 Steel-Belt

82253612

8,1

117,45

TKEB9-275

1306

TMK10

1400

14

6.00-9"

10

T-523

82251114

8,5

123,25

TMK10-275

1405

14

6.00-9"

12

T-523 HS

82251505

10

145

TMK7

1404

14

6.00-9"

12

T-523 Steel-Belt

82253612

8,1

117,45

TMK7GT

1406

 

TT10H2

1610

3.00-4"

6

T-991 impl.

82251314

7

101,5

TT10H6

1611

14

6.00-9"

10

T-523

82251114

8,5

123,25

TT10H2-275

1612

14

6.00-9"

12

T-523 HS

82251505

10

145

TT10H6-275

1613

14

6.00-9"

12

T-523 Steel-Belt

82253612

8,1

117,45

SW2000

2425

3.00-4"

6

T-991 impl.

82251314

7

101,5

14

6.00-9"

6

T-523

82251002

2,2

31,9

CS1000

1507

14

6.00-9"

10

T-523

82251114

8,5

123,25

CS1000 MKII

1510

14

6.00-9"

12

T-523 HS

82251505

10

145

CS1000 MKIII

1511

14

6.00-9"

12

T-523 Steel-Belt

82253612

8,1

117,45

SKE8

1001

14

6.00-9"

10

T-523

82251114

8,5

123,25

SKE12

1003

14

6.00-9"

12

T-523HS

82251505

10

145

14

6.00-9"

12

T-523Steel belt

82253612

8,1

117,45

SKE15

1004

4.00-4"

6

T-991

82251435

7

101,5

SKE20

1005

14

7,50-10"

10

T-523 82251071

6,5

94,25

14

7,50-10"

14

T-523HS

82251501

9

130,5

14

6.00-9"

6

T-523

82251002

4,3

62,35

14

6.00-9"

12

T-523HS

82251505

10

145

ITM35

1501

4.00-8"

6

T-49 HS

82251278

5,2

75,4

ITM45

1502

155/70R-13"

75 Q M+S

82250006

2,2

31,9

ITM60

1503

Epomini 5

2.00-16"

VM 100

82256258

2,5

36,25

Epomini 20

2.75-17"

VM 100

82256299

2,75

39,875

IGLO S2400

2490

18x8.0-10

82250008

6

87

2491

185-R14"

8

P75

82250001

4,5

65,25

2492

185-R14"

8

P75

82250001

4,5

65,25

2493

18x8.0-10

82250008

6

87

2494

185-R14"

8

P75

82250001

4,5

65,25

2495

185-R14"

8

P75

82250001

4,5

65,25

TS1000

1551

9

185QR-14"

P75

82252279

3

43,5

9

185-R14"

8

P75

82250001

3

43,5

TS1000

1552

9

215/75R-17,5"

L71

82250005

8,5

123,25

PW803H

3105

10,5

155/70R-13"

75 Q M+S

82250006

1,5

21,75

PW23H

3130

 

SWxxxx

14

185R-14"

MS PLUS 3 Q

82252279

1,5

21,75

EpoJet
PWV87

Air pressure at

50 km/h

Содержание SKE Series

Страница 1: ...ber here Type Year Ident no Valid from ident no SKE 8 10010200 SKE 12 10030200 SKE 15 10040200 SKE 20 10050200 Published and printed by Epoke A S Documentation department Changes of technical details...

Страница 2: ......

Страница 3: ...2 1 3 4 Safety during cleaning repairs and maintenance 6 2 1 3 5 Suggestions for a user guide 7 2 1 11 Lubricating grease 7 2 2 Product descriptions 2 2 0 1 Machine overview 8 2 2 1 Product descripti...

Страница 4: ...be trained and instructed If necessary this can be implemented through the manufacturer supplier as desired by the purchaser user of the spreader Training abroad is carried out by the local dealers M...

Страница 5: ...000 SKE20 10050200 2000 1 4 Country of origin Denmark 1 5 CE mark CE mark is placed on the machine sign 1 6 EU certificate of conformity The above spreader has been manufactured in accordance with the...

Страница 6: ...or winter service are machines for removing winter obstacles in traffic areas and spreaders are machines for defined spreading of thawing materials or sand on surfaces car rying traffic The spreaders...

Страница 7: ...ion of the personnel for starting operating maintenance and repair must be clearly defined Personnel in training may only work with the spreader under the supervision of an experienced person Instruct...

Страница 8: ...d to the spreader Unauthorised persons are to be turned away from the danger zone Persons must not be in the immediate proximity of the machine 1 m to the side of the machine when the machine is opera...

Страница 9: ...ions information of the operation to your staff e g Normal permitted usage Abnormal usage Safety in public traffic The user must be aware of that his her presence in the danger zone working area is fo...

Страница 10: ......

Страница 11: ...The wheels supply all the energy needed for operation of the spreader which is thus completely surface dependent Dosing system The material tank and the supporting frame are welded together The tank...

Страница 12: ...9 epoke SKE8 12 15 20 GB 0305 1 2 2 4 6 7 8 9 10 1 2 3 4 5 C B A C D...

Страница 13: ...t and many cams Great amount sand etc Small and less cams Small amount salt 5 The delivery cams If the cams are worn they are to be replaced If the screws are rustbound the cams can be blasted with a...

Страница 14: ...dth min mm 1008 1390 1390 1918 Rim size 4 00 E x 9 4 00 E x 9 5 50F x 10 5 50F x 10 Tyre size 10PR 6 00 9 6 00 9 7 50 10 7 50 10 Tyre size 12PR 6 00 9 6 00 9 7 50 10 7 50 10 Tyre size 14PR 7 50 10 7 5...

Страница 15: ...iagram Electrical diagram see spare parts manual 2 5 Corrosion protection All Epoke products were sandblasted with steel balls zinc dusted with 1 component epoxyester does not apply to non corrosion r...

Страница 16: ...no persons between the spreader and the vehicle 4 Coupling of spreader and vehicle Replace the vehicle 5 Once the coupling has been completed check to make sure that it is correct 6 Connect the supply...

Страница 17: ...ote control 5 4 2 1 Correct installation Direct current requirements for the electric control system of the spreader 11V 32V When switching between 12V and 24V vehicles working lamp and rotating beaco...

Страница 18: ...g Spring base adjustment is lubricated through the lubri cation nipple with grease see inspection list mechanical item 6 3 1 Defect cams are to be replaced If the screws are rustbo und the cams can be...

Страница 19: ...st not however be firmly tightened Rolling chain lubrication Wynn s Viscotene 50 h Silicone spray grease 8 Wheel nuts 140 Nm 14 0 kpm 50 h Tightening moment 9 Air pressure see tyre list 50 h 10 Spring...

Страница 20: ...13 Strickler Lubricating oil 100 h 14 Clutch lever Lubricating oil 100 h 15 Eccentric Lubricating oil 100 h 16 Stabiliser and support leg Lubricating oil 100 h 17 Nuts for drawbar 120 Nm 12 0 kpm Bef...

Страница 21: ...se or biological lubricating grease Mineral lubricating grease Texaco Texando CX EP 2 Biological lubricating grease Texaco Biostar Grease LC EP 2 6 7 Reference to suitable spare parts Rubber base 8x21...

Страница 22: ...19 epoke SKE8 12 15 20 GB 0305 1 Tested Inspection Steadying wheel Control at use Visual inspection Date Signed Result Date Signed 7 1 2...

Страница 23: ...Tested Inspection Dry matter container Control at use Visual inspection Date Signed Result Date Signed Visual checks should include checks for exterior damage deformities wear and tear and corrosion I...

Страница 24: ...sting height self locking nuts must only be used once i e always use new self locking nuts Nut M14 DIN 985 A2 torque is 120 Nm Do not perform subsequent changes on the drawbar e g welding repairs Chec...

Страница 25: ...23 HS 82251505 10 145 CS1000 MKIII 1511 14 6 00 9 12 T 523 Steel Belt 82253612 8 1 117 45 SKE8 1001 14 6 00 9 10 T 523 82251114 8 5 123 25 SKE12 1003 14 6 00 9 12 T 523HS 82251505 10 145 14 6 00 9 12...

Страница 26: ...23 epoke SKE8 12 15 20 GB 0305 1 8 1...

Страница 27: ...ant requirement in order to assert oneself in international trade and frequ ently also in order to participate in open tenders The company has held the certificate since April 21 1993 and it is applic...

Страница 28: ...of parts of the human body EN 418 1993 Safety of machinery Emergency stop equipment functional aspects Principles for design EN 811 1996 Safety of machinery Safety distances to prevent danger zones b...

Страница 29: ...estrictions on use 4 Inspection list mechanical 16 Inspection lists and overviews 16 Instructions for Initial Operation 14 Instructions for repair and assembly 15 L Lubricating grease 7 M Machine over...

Отзывы: