ENVIRO-TEC
6
FORM ET115.24-NOM4 (819)
TABLE OF CONTENTS
SECTION 1 - RECEIPT & INSTALLATION ............................................................................................................ 11
Preface ......................................................................................................................................................... 11
Unpacking & Inspection ................................................................................................................................. 11
Ship Loose Items .......................................................................................................................................... 11
Handling & Installation .................................................................................................................................. 12
Cooling/Heating Medium Connections ........................................................................................................... 12
Flex Hose ..................................................................................................................................................... 14
Factory Installed Risers ................................................................................................................................ 14
Factory Furnished, Field Installed Risers ..................................................................................................... 15
Field Furnished and Installed Piping or Risers ............................................................................................. 16
Riser Connection .......................................................................................................................................... 16
Ductwork Connections ................................................................................................................................. 17
Dual Air Discharge Units ....................................................................................................................... 17
Field Reconfigurable Risers and Discharge Openings ................................................................................... 18
Riser Reconfiguration
.......................................................................................................................... 18
Discharge Opening Reconfiguration ............................................................................................................. 18
Wall Framing ................................................................................................................................................. 19
Tandem Master & Tandem Slave Unit Installation ........................................................................................ 19
Outside Air Connection ................................................................................................................................. 20
Manual Outside Air Damper ......................................................................................................................... 20
Motorized Outside Air Damper ..................................................................................................................... 20
Electrical Connections Shock / Electrical Hazards ......................................................................................... 20
Thermostats ................................................................................................................................................. 21
SECTION 2 - START-UP .........................................................................................................................................23
General ......................................................................................................................................................... 23
Cooling/Heating System ............................................................................................................................... 23
Air System Balancing ................................................................................................................................... 24
Water System Balancing .............................................................................................................................. 24
Controls Operation ....................................................................................................................................... 24
Fan Coil EC Motor Control ............................................................................................................................. 25
G3 PWM Board ..................................................................................................................................... 25
PWM Board Status LED ........................................................................................................................ 25
G3 PWM Status Descriptions ................................................................................................................ 26
Adjusting EC Motor Speed .................................................................................................................... 27
2 – 10 VDC Proportional Motor Control .......................................................................................................... 29
EC Motor Troubleshooting Guidelines ............................................................................................................ 32
Checking EC Wire Harnesses ........................................................................................................................ 35
EC Motor and Driver ....................................................................................................................................... 35
Constant Airflow/Constant Torque EC Motors
....................................................................................... 35
Constant RPM EC Motors ..................................................................................................................... 36
Constant RPM EC Motor Driver Enable Jumper ................................................................................... 37
ECM 3-Speed Constant Torque Motor Troubleshooting Guide
...................................................................... 38
Procedure for Checking ECM Constant Torque Wiring Harnesses
....................................................... 39
ECM Constant Torque Motor Connections
............................................................................................ 39
ECM Constant Torque Motor Specifications
.......................................................................................... 40
Содержание VHA
Страница 10: ...ENVIRO TEC 10 FORM ET115 24 NOM4 819 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 22: ...ENVIRO TEC 22 FORM ET115 24 NOM4 819 SECTION 1 RECEIPT INSTALLATION THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 41: ...ENVIRO TEC 41 SECTION 2 START UP FORM ET115 24 NOM4 819 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...ENVIRO TEC 54 FORM ET115 24 NOM4 819 SECTION 6 Dimensional Data 74 80083 ...
Страница 78: ...ENVIRO TEC 78 FORM ET115 24 NOM4 819 SECTION 6 Dimensional Data NOTES ...