55
Secondary Installation
Step 5
Place Log 4 to the right, with the
top resting on the socket of Log 3
and the right side touching Log 2.
Step 6
Rest Log 7 on top of Log 4 and
on the edge of the ember bed
between the grate arms. Do
not obstruct burner ports in
highlighted area.
Step 7
Rest Log 6 on an angle on top of
Log 5 and align the bottom end
socket with the grate arm.