Entrematic Canada Inc.
Toll Free: 1-877-348-6837
[email protected]
www.ditecentrematic.ca
Entrematic USA Inc.
Toll Free: 1-866-901-4284
[email protected]
www.ditecentrematic.us
Pg. 12
HA8-LP Manual V. 4.0
STEPS
1
Verify that the operator is the correct orientation.
Left Push, Right Push, Left Pull
or
Right Pull
2
Holes are provided for the high voltage wires. Hold the back plate in position and mark the wall. If the hole is not at a
convenient location, you can drill the backer plate to suit.
3
Anchor the back plate to the wall with minimum of six (6) - #14 x
1” Pan Quad Type A screws (provided). You may need
to provide other screws if your installation requires it.
4
Use two (2) screws to fasten the back plate directly to the doors vertical jambs on the hinge side.
Holes can be made anywhere in header to secure. All holes MUST be drilled into substantial
support (studs, blocks, framing, etc.). This diagram may not reflect your installation.
Do Not use Drywall Screws or Hollow Wall Anchors to mount the Back Plate / Header.
TYPICAL THROUGH-HOLE INSTALLATION
PRE-DRILLED UPPER HEADER ANCHORING HOLES
PRE-DRILLED INCOMING POWER WIRE HOLE
(TYPICALLY LATCH SIDE)
DOOR FRAME HEADER
ANCHORING HOLES
2.0 OPERATOR INSTALLATION