
54
Solution 1.6 Installation and Operation Manual
Note that secondary air tubes (A) can be replaced without removing the baffle board (B).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Solution 1.6
Front
►
30 holes of 0.140"
Middle front
►
30 holes of 0.136’’
Middle rear
►
20 holes of 0.147’’
Rear
►
15 holes of 0.128’’
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...