
Solution 1.6 Installation and Operation Manual
51
Appendix 6: Installing the Fire Screen (AC01342)
Open the door.
Hold the fire screen by the two handles
and bring it close to the door opening.
Lean the upper part of the fire screen
against the top door opening making
sure to insert the top fire screen
brackets
behind
the
primary
air
deflector as in (Detail A).
Lift the fire screen upwards and push
the bottom part towards the stove then
let the fire screen rest on the bottom of
the door opening.
Warning: Never leave the stove unattended while in use with the fire
screen.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...