
Solution 1.6 Installation and Operation Manual
45
Appendix 2: Installing the Door Overlay
In order to complete the assembly of your wood stove, you need to install the door overlay. See
figure below for installation instructions:
Position the overlay (A) on the door
frame and secure it from the inside of
the door using the 4 included screws
(B).
To facilitate the installation, do not
tighten the screws until they are all
installed.
Note: It is not necessary to remove the
glass or any other component to install
the overlay
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...