
44
Solution 1.6 Installation and Operation Manual
Leg kit installation:
4- Secure
both
leg
support
assembly (I) (to the underside
of the firebox using the bolts,
washers and nuts removed in
step 3. Supports can be
installed on either side.
Note: Insert each bolt from the
inside of the firebox, this will allow
the bricks to sit more evenly on the
floor of the firebox.
5- Gently flip the stove back on its
legs making sure not to put too
much weight on the rear legs.
6- Open the ash drawer (J) lid
then slide it on the left and right
bend of the legs support
brackets.
9- Position the stove for its
installation and reinstall the
bricks, ash plug and loading
door
(see
Appendix
9:
Exploded Diagram and Parts
List for bricks layout).
Note:
Make
sure
that
baffle
components
have
not
moved
during the leg installation process
since a flue blockage may occur.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...