
Solution 1.6 Installation and Operation Manual
41
Appendix 1: Installing the Legs or Pedestal
The leg or pedestal kit must be assembled to the firebox before positioning the stove. See
installation instructions below:
1- Remove the firebricks, the ash
dump plug and the loading door
from the stove to avoid breaking
any parts and facilitate handling
in the followings steps.
2- Gently flip the stove on its back.
3- Remove the (2) transport support
bracket
(A)
which
can
be
discarded. Keep the (4) bolts (B),
washers (C) and nuts (D) since
they will be required in step 5.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...