
Solution 1.6 Installation and Operation Manual
53
Appendix 8: Installation of Secondary Air Tubes and Baffle
1- Starting with the rear tube, lean and insert
the right end of the secondary air tube into
the rear right channel hole. Then lift and
insert the left end of the tube into the rear
left channel.
2- Align the notch in the left end of the tube
with the key of the left air channel hole.
Using a « Wise grip » hold the tube and lock
it in place by turning the tube as shown in
detail A. Make sure the notch reaches the
end of the key way.
3- Repeat step 1 and 2 for the other
secondary air tubes*.
4- To remove the tubes use the above steps in
reverse order.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...