
42
Solution 1.6 Installation and Operation Manual
Pedestal kit installation:
Follow step 1, 2 and 3
4- Install the dashboard (e) to
the pedestal (g) with 2
screws (f). Then, secure
the pedestal backing panel
to the rear of the pedestal.
5- Secure pedestal base to
the
underside
of
the
firebox using the bolts,
washers
and
nuts
removed in step 3.
Note: Insert each bolt from the
inside of the firebox, this will
allow the bricks to sit more
evenly on the floor of the
firebox.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...