
48
Solution 1.6 Installation and Operation Manual
Appendix 5: Installing the Fresh Air Kit (AC01336 / AC01348)
This mobile home approved stove requires installation of a fresh air kit (D) and an insulated fresh
air intake pipe (E), sold separately.
When installed with a fresh air kit, the stove must be anchored to the floor.
Installation of AC01336:
Wall installation
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...