
Solution 1.6 Installation and Operation Manual
43
6- Gently flip the stove back
on its pedestal making
sure not to put too much
weight on the rear edge of
the base.
7- Open the ash drawer (h)
lid then slide it into the
front
opening
of
the
pedestal.
8- Position the stove for its
installation and reinstall
the bricks, ash plug and
loading
door
(see
Appendix 9: Exploded
Diagram and Parts List
for bricks layout).
Note: Make sure that baffle
components have not moved
during the leg installation
process since a flue blockage
may occur.
Содержание Solution 1.6 AGENCY PHASE II CERTIFIED WOOD
Страница 8: ...8 Solution 1 6 Installation and Operation Manual ...
Страница 29: ...Solution 1 6 Installation and Operation Manual 29 Clearances to combustible materials and floor protection ...
Страница 32: ...32 Solution 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 49: ...Solution 1 6 Installation and Operation Manual 49 Floor installation ...
Страница 50: ...50 Solution 1 6 Installation and Operation Manual Installation of AC01348 Wall installation Floor installation ...
Страница 55: ...Solution 1 6 Installation and Operation Manual 55 Appendix 9 Exploded Diagram and Parts List ...