62
ESE 1408 DBG ES DIN
Status at: May 2015
1.
Put plug for the external energy source (e.g. a battery
charging device) / charge retention device socket con-
necting cable in place.
The battery charge conservation device is ready to oper-
ate.
5.8 3-way fuel valve / Refuelling device
Proceed as follows to use the refuelling device with the gen-
erator.
The following requirements must be met:
generator is ready for operation
3-way fuel valve
In the course of supplying fuel you can select between the
device's own tank and the refuelling device.
Fig. 5-12: 3-way fuel valve
Switch position
Operation
1
CLOSED
2
OWN TANK
3
EXTERNAL REFUELLING
Table 4.7: Switchingpositions of the 3-way fuel tap
Establish a connection to the fuel supply system as follows:
1.
Set the fuel valve to the required fuelling mode.
Requirements
1
2
3
Содержание ESE 1408 DGB ES DIN
Страница 12: ...General information 12 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 26: ...26 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 33: ...Status at May 2015 ESE 1408 DBG ES DIN 33 Notes...
Страница 42: ...42 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 84: ...84 ESE 1408 DBG ES DIN Status at May 2015 9 3 Generator Fig 9 3 Replacement parts Generator Item Article name...