5.2.2 Insulation monitoring with switching
off(Optional, on when requested by the
customer)
The following requirements must be met:
Generator started
1.
Unplug the device
2.
The circuit breaker must be in Pos. 1.
3.
Press the test button
(see Fig. 4--(1))
Figure 4-7-(9))
and the position
of the circuit breaker indicate the result:
Symbol
Result
Significance
lights up red
Circuit breaker jumps to Pos. 0 and
the generator cuts out
Insulation monitoring is OK
stays off
Circuit breaker stays in Pos. 1 and
the generator continues to run
Insulation monitoring is defective
Table 4.5: Insulation monitoring plus switching off
The insulation monitoring test has been run.
The reset button
(see Fig. 4--(2))
must be pressed after
switching off and the circuit breaker must be turned back
to Pos. 1 so that the unit can be used again.
1.
Plug in the device and switch on.
Figure 4-7-(8))
and the position
of the circuit breaker indicate the result:
Symbol
Significance
Yellow
Insulation fault (≤ 23 kΩ)
stays off
Connected unit is OK
Table 4.6: Insulation monitoring whilst running without switching off
If an insulation fault exists and the unit was previously
OK when tested without a device connected (see above),
the insulation fault has been caused by the device.
2.
After the device has been switched off and unplugged
,
the circuit breaker must be returned to Pos. 1, and
the generator must be restarted, in order for the device to
be operated again.
Requirements
Testing the insulation
monitoring:
Insulation monitoring
whilst running:
Содержание ESE 1408 DGB ES DIN
Страница 12: ...General information 12 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 26: ...26 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 33: ...Status at May 2015 ESE 1408 DBG ES DIN 33 Notes...
Страница 42: ...42 ESE 1408 DBG ES DIN Status at May 2015 Notes...
Страница 84: ...84 ESE 1408 DBG ES DIN Status at May 2015 9 3 Generator Fig 9 3 Replacement parts Generator Item Article name...