Installation
Liquistation CSF48
24
Hauser
Connecting the suction line in the version with the vacuum pump
1. Unscrew the thread adapter nut (item 3).
2. Unscrew the hose gland (item 4) from the side panel.
3. Fit the hose gland in the fixing clamp (item 2) as illustrated.
4. Screw the hose tight from above.
5. Attach the hose adapter supplied to the suction line and screw it onto the hose gland from
below.
6. Insert the dummy plugs supplied.
a0013707
Fig. 14: Connecting the suction line from the side (as-delivered
state)
1
Hose
2
Fixing clip for hose gland
3
Thread adapter nut
4
Hose gland
a0013708
Fig. 15: Suction line connected from below
1
2
3
4
Содержание Liquistation CSF48
Страница 2: ......
Страница 39: ...Liquistation CSF48 Electrical connection Endress Hauser 39 a0016537 Fig 41 E basic module wiring diagram ...
Страница 267: ...Liquistation CSF48 Endress Hauser ...
Страница 268: ...www addresses endress com ...