Liquistation CSF28
Maintenance
Hauser
55
12.1.2 Calibration
Distribution arm
The position of the distribution arm is set at the factory. It is only possible to calibrate the
distribution arm in the version with multiple bottles.
The distribution arm must be calibrated if:
• The distribution arm motor has been replaced
• Error message "F328 Distribution arm" appears on the display
Proceed as follows to calibrate the distribution arm:
1. Under menu
Application
/
Calibration
/
Distribution arm
/
Go to ref. point
The reference run is started. The reference point is in the middle at the front. For
the version with a distributor plate, the reference point is at the arrow in the
middle of the plate.
With
Adjust
, you can correct the distribution arm if the unit does not move to the
reference point correctly. Use the two arrow keys to correct the position.
2.
Sample volume or vacuum pump
The dosing volume of the vacuum pump is set to 200 ml (6.76 oz) at the factory. The
required sample volume is set by moving the dosing pipe manually.
NOTICE
Calibration not possible during operation.
The sample volume cannot be determined.
‣
Stop the sampling program before calibrating the sample volume.
Sampling volume calibration
Proceed as follows to calibrate the sample volume:
Содержание Liquistation CSF28
Страница 2: ......
Страница 72: ...www addresses endress com 71571081 71571081...