Liquistation CSF28
Maintenance
Hauser
57
4. Reinstall the parts in reverse order. Make sure that the contacts of the conductivity
sensors are in the correct position.
5. Check that the dosing tube is set correctly by performing manual sampling.
Peristaltic pump sample volume
The sample volume of the peristaltic pump is calibrated at the factory.
In order to calibrate the sample volume, a graduated beaker with a volume of at least 200
ml (6.76 oz) is required.
1. In the menu select
Application
/
Calibration
.
2. Enter the desired volume under
Sample volume
.
3. Start sampling.
12.1.3 Replacing the pump tube
L
WARNING
Rotating parts
Minor to medium injury possible.
‣
Take the sampler out of service before opening the peristaltic pump.
‣
Secure the sampler against unintentional start-up while you work on the opened hose
pump.
Opening the peristaltic pump
1
2
3
4
5
6
7
A0014115
24
Opening the peristaltic pump
1
2
3
4
5
6
7
Retainer
Pump tube
Fastening clip
Pump bracket
Pump head cover
Positioning pin
Knurled head screw
1. Take the sampler out of service by pausing a program that is currently running.
2. Open the fastening clip (item 3) and push up the pump bracket (item 4).
3. Remove the knurled head screw (item 7) and open the pump head cover (item 5) to
the right.
Содержание Liquistation CSF28
Страница 2: ......
Страница 72: ...www addresses endress com 71571081 71571081...