Installation
Deltatop DP71B, DP72B, DP73B
34
Hauser
3.16
Post-installation check
3.16.1
Checks following initial installation
Perform the following checks after installing the measuring device:
• Do the process temperature/pressure, ambient temperature, measuring range etc. correspond to
the specifications of the device?
• Does the arrow on the head of the pipe or the flange plate match the actual flow direction?
• Are the measuring point number and labeling correct (visual inspection)?
• Is the orientation chosen for the sensor correct, in other words suitable for the sensor type,
application and medium properties, in particular medium temperature?
• Is the measuring device protected against moisture and direct sunlight?
• Are the screws of the packing or the flange firmly tightened?
• Are the threaded connections and/or flange connections tight?
3.16.2
Additional checks when demounting/mounting the probe
during plant operation
Perform the following additional checks when demounting/mounting the probe during plant
operation:
• Is the device damaged (visual inspection)?
• Is the probe free of deposit and damage?
Содержание Deltatop DP71B
Страница 2: ......
Страница 48: ...Appendix Deltatop DP71B DP72B DP73B 48 Endress Hauser...
Страница 49: ...Deltatop DP71B DP72B DP73B Appendix Endress Hauser 49...
Страница 52: ...www endress com worldwide BA386P 00 EN 07 09 71098177 CCS FM SGML 6 0 ProMoDo 71098177...