Operation and commissioning
Deltatop DP71B, DP72B, DP73B
36
Hauser
5
Operation and commissioning
5.1
Configuration of the differential pressure transmitter
Deltabar S and Deltabar M
The operation of the Deltabar S differential pressure transmitter and the process for commissioning
measurement are described in the following Operating Instructions:
The appropriate Operating Instructions are supplied together with the Deltabar S or Deltabar M.
!
Note!
If the differential pressure transmitter is ordered with the primary device, then it is completely pre-
configured on delivery. The parameters do not have to be configured in this case.
If an unconfigured differential pressure transmitter is used, the configuration data can be obtained
from the supplied calculation sheet or can be calculated by the "Applicator" selection and sizing tool.
!
Note!
The formulae according to which the flow is calculated are summarized in the Appendix (
46).
5.2
Configuration of temperature and pressure
compensation
5.2.1
Calculation of the compensated volume flow or mass flow
•
For steam
Flow and Energy Manager RMS621 for water and steam from Hauser;
for details see Technical Information TI092R
•
For all media
Universal Flow and Energy Manager RMC621 for gases, liquids and steams from
Hauser; for details see Technical Information TI098R
•
For all media
by a PLC;
In this case the compensation calculation has to be programmed by the user.
Communication
Operating Instructions (Deltabar S)
Operating Instruction (Deltabar M)
4 to 20 mA HART
BA270P
BA382P
PROFIBUS PA
BA294P
-
Foundation Fieldbus
BA301P
-
Содержание Deltatop DP71B
Страница 2: ......
Страница 48: ...Appendix Deltatop DP71B DP72B DP73B 48 Endress Hauser...
Страница 49: ...Deltatop DP71B DP72B DP73B Appendix Endress Hauser 49...
Страница 52: ...www endress com worldwide BA386P 00 EN 07 09 71098177 CCS FM SGML 6 0 ProMoDo 71098177...