Sulfur analysis with the UVFD 5000, MPO 5000
multi EA 5000
72
}
Leave the "sample out" outlet unconnected or connect it to the measuring gas inlet of
the next detection module.
}
For detection modules with MPO technology: Install the chemical ozone decomposer
on the rear of the module:
– Fasten the two holding clamps with the supplied screws.
– First press the chemical ozone decomposer into the upper holding clamp and
then into the lower one.
– Connect the hose from the "waste (MPO)" outlet to the ozone decomposer. Do not
pull the hose out of the device!
ü
Connection of the detection module is complete.
Figure 45Chemical ozone decomposer