370XA Gas Chromatograph
System Reference Manual
APRIL 2014
7P00370-H01
3 - 21
3.4.2
Connect sample conditioning system tubing to the
GC
1.
Use the tubing supplied with the sample system to connect the
stream, calibration, actuation, and calibration gases from the
sample plate to the GC’s manifold block.
(1) Calibration tubing
(2) Sample tubing
(3) Actuation tubing
(4) Carrier tubing
Содержание Rosemount 370XA
Страница 1: ...Revision A 7P00370 H01 April 2014 370XA Gas Chromatograph System Reference Manual ...
Страница 24: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 2 9 2 7 Interior Maintainable Module ...
Страница 32: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 3 5 3 3 2 2 Dimensions ...
Страница 38: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 3 11 3 3 3 2 Dimensions ...
Страница 60: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 3 33 3 9 1 Terminal wiring diagram ...
Страница 137: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 5 8 ...
Страница 138: ...6 1 Section 6 Overhauling the maintainable module ...
Страница 177: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 40 Column 2 ...
Страница 178: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 41 Column3 ...
Страница 179: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 42 Column 4 ...
Страница 180: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 43 Sample Pre Heat Coil Sph ...
Страница 181: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 44 Carrier Pre Heat Coil Cph ...
Страница 182: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 45 Sample Loop SL ...
Страница 183: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 46 Restrictor Column R ...
Страница 193: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 6 7 2 1 The GC won t power up ...
Страница 194: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 7 7 2 2 Un normalized total error ...
Страница 195: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 8 ...
Страница 196: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 9 7 2 3 Carrier pressure ...
Страница 197: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 10 7 2 4 Heater won t reach set point ...
Страница 198: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 11 ...
Страница 199: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 12 ...
Страница 200: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 13 ...
Страница 201: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 14 7 2 5 Module validation fails ...
Страница 202: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 15 ...
Страница 203: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 16 7 2 6 Auto valve timing fails ...
Страница 204: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 17 ...
Страница 205: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 18 ...
Страница 206: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 19 ...
Страница 207: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 20 This page is intentionally left blank ...
Страница 208: ...This page is intentionally left blank ...