Figure 2-8: 90 Degree angle between slings
9. NEVER allow the slings to contact the electronics enclosure. Damage to the
enclosure may occur. Use a spreader bar with the slings to prevent contact with the
electronics enclosure and the base enclosure (see
in contact with the electronic enclosure then remove the two bolts holding the
enclosure to its base and temporarily remove the head from the meter during the
lifting operation. You will need to unplug the cable from J3 on the Acquisition
Module. Two screws hold this cable in place. Once the lifting operation is complete,
reattach and secure the electronics cable to J3 on the Acquisition Module, return
the electronics enclosure to its original position, replace the bolts, and secure the
enclosure in place. Lifting the meter with the upper enclosure installed but without
the bolts installed, may cause the electronics to fall and cause personal injury or
equipment damage.
Installation manual
Mechanical Installation
3-9000-760
May 2019
Installation manual
41
Содержание Daniel 3814
Страница 1: ...Installation manual 3 9000 760 Rev HA May 2019 Daniel 3814 Liquid Ultrasonic Flow Meter ...
Страница 2: ...2 ...
Страница 10: ...Contents Installation manual May 2019 3 9000 760 x 3814 Liquid Ultrasonic Flow Meter ...
Страница 48: ...Mechanical Installation Installation manual May 2019 3 9000 760 48 3814 Liquid Ultrasonic Flow Meter ...
Страница 92: ...Configuration Installation manual May 2019 3 9000 760 92 3814 Liquid Ultrasonic Flow Meter ...
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ...Engineering Drawings Installation manual May 2019 3 9000 760 94 3814 Liquid Ultrasonic Flow Meter ...