background image

 

4.

 

INTRODUCTION 

 

Emaux 

SSCmini

®

 is an automatic chlorine generation system for pool sanitization and it is composed by two 

main components: an electrolytic cell and a control unit.     
 

4.1

 

ELECTROLYTIC CELL 

 

The electrolytic cell is composed by a number of titanium plates (electrodes) placed in a cell holder. The 
control unit regulates electrical current that passes through the titanium plates. One extreme of the plates 
will be anode and the other will be cathode. 
Adding  a  certain  concentration  of  salt  in  the  water,

 

this  passes  through  the  plates  and  thanks  to  the 

electrical current, the Hypochlorous acid is produced. 
 
The following chemical reactions are produced in the plates of the electrolytic cell: 
Positive pole (anode):     

2 H

2

 O

2

 + 4 H

+

 + 4e

   

 

 

 

 

 

2 NaCl 

 Cl

2

 + 2 Na

+

 + 2e

-

 

Negative pole (cathode):    2 H

2

O + 2e

-

 

 H

2

 + OH

-

 

Final chemical reaction:  

Cl

2

 + OH

-

 

 HClO + Cl

-

 

 
The operation requires a certain concentration of salt (4000 ppm), low enough that it normally will not 
be tasted. The 

SSCmini

®

 automatically sanitizes your pool by converting the salt into Hypochlorous acid 

which kills bacteria and algae in the pool through a process called electrolysis.   
Because chlorine will revert back to sodium chloride after killing the bacteria, the above reactions will 
continuously recycle virtually eliminating the need to add sanitizing chemicals to your pool. The only time 
you may need to add more salt to the pool is when water is replenished due to backwashing, draining, 
or splashing. 
 

4.2  CONTROL UNIT 

 

The control unit is provided with a microprocessor driven control system to regulate operation time and 
inform about

 SSCmini

®

 

operation status and errors. The system also includes a self-cleaning procedure 

that avoids scale formation on the electrodes. 

 

5.

 

SAFETY WARNING AND RECOMMENDATIONS 

 
The equipment should be assembled and handled by truly qualified people.   
Current electrical and accident prevention regulations should be followed. 
Under no circumstances will the manufacturer be held responsible for the assembly, installation or start-up, 
nor any handling or fitting of components unless they are carried out on its premises. 
The working voltage of 

SSCmini

®

 is 220-240V, 50/60Hz.

 

Do not attempt to alter the system to operate at 

a different voltage. 
Check all the electrical connectors to avoid false contacts and their consequent overheating. 
Before installing and replacing any component, disconnect the control unit from the main power supply; 
only replacements provided by Emaux can be used for replacing.   
The control unit must be installed in places with sufficient ventilation. The equipment should not be installed 

Содержание SSC mini

Страница 1: ...1 SALT CHLORINATOR USER MANUAL SSCmini...

Страница 2: ...side the wiring compartment To reduce the risk of electric shock this terminal must be connected to the grounding means provided in the electric supply service panel with a continuous copper wire equi...

Страница 3: ...acteria the above reactions will continuously recycle virtually eliminating the need to add sanitizing chemicals to your pool The only time you may need to add more salt to the pool is when water is r...

Страница 4: ...lkalinity 80 120 ppm Calcium Hardness 200 400 ppm Metal 0 ppm 6 1 SALT LEVEL The amount of salt required when using Emaux SSCmini is between 4000 and 6000 ppm To reach this concentration it is necessa...

Страница 5: ...enclosure that is suitable for outdoor mounting IPX4 rating However the following points must be taken into consideration for a correct installation of the control unit 1 Install the Control Unit usi...

Страница 6: ...ed in a vertical position 8 START UP Before starting up Emaux SSCmini unit the following points have to be taken into consideration 1 Check if the filter is completely clean and ensure that the swimmi...

Страница 7: ...ng guide Chapter 12 3 Alarm The unit is not working properly Refer to the Troubleshooting guide Chapter 12 4 Stand by The unit is in between operation cycles 5 Normal operation Electrolytic cell is ge...

Страница 8: ...LED is ON A new cycle will start at 10 00 until 10 30 and so on If you activate Superchlorination mode at 10 30 Superchlorination LED is ON then the unit will be working until 10 30 of the next day a...

Страница 9: ...ebris which has passed through the filter and caught on the plates 3 Try to remove the scale using a plastic or wooden tool do NOT use metal as this will scratch the coating off the plates If the scal...

Страница 10: ...pply Disconnect the unit from power supply for two minutes and then connect it again Ensure that SSCmini is receiving 220V 240VAC 50 60H input LED 4 Water temperature out of working range Test water t...

Страница 11: ...equipment or installation type 4 Damage due to unauthorized product modifications or failure to use Emaux original replacement parts 5 Damage caused by negligence or failure to properly maintain produ...

Страница 12: ...chnical operations Emaux is not liable for any loss of time inconvenience incidental expenses such as labor cost phone calls legal cost or material cost incurred in connection with the replacement or...

Отзывы: