background image

 

12 

13.3. WARRANTY OBLIGATION 

 

Emaux warrants any of above items from workmanship and/or material(s). 
Should a defect become evident during the term of warranty, Emaux will, at its option, repair or replace 
such item or part at its own cost and expense. Customer will need to follow the warranty claim procedures 
from Emaux in order to obtain the benefit on this warranty. 
Emaux is not, however, responsible under this warranty for any cost of shipping or transportation of the 
equipment or parts thereof “to” or “from” our technical operations. Emaux is not liable for any loss of 
time,  inconvenience,  incidental  expenses  such  as  labor  cost,  phone  calls,  legal  cost  or  material  cost 
incurred in connection with the replacement or removal of the equipment, or any other consequential or 
incidental damage on persons or assets. Emaux will be not responsible for any business profit loss or 
operation stop due to the non-conformity product equipment. No indemnity or damages can be claimed 
on any account whatever. 

 

13.4. WARRANTY OR REPRESENTATIONS BY OTHERS 

 

No dealer or other person has authority to make any warranty or representation concerning Emaux or its 
products. 
Accordingly, Emaux is not responsible for any such warranty or representation. 

 
 

Содержание SSC mini

Страница 1: ...1 SALT CHLORINATOR USER MANUAL SSCmini...

Страница 2: ...side the wiring compartment To reduce the risk of electric shock this terminal must be connected to the grounding means provided in the electric supply service panel with a continuous copper wire equi...

Страница 3: ...acteria the above reactions will continuously recycle virtually eliminating the need to add sanitizing chemicals to your pool The only time you may need to add more salt to the pool is when water is r...

Страница 4: ...lkalinity 80 120 ppm Calcium Hardness 200 400 ppm Metal 0 ppm 6 1 SALT LEVEL The amount of salt required when using Emaux SSCmini is between 4000 and 6000 ppm To reach this concentration it is necessa...

Страница 5: ...enclosure that is suitable for outdoor mounting IPX4 rating However the following points must be taken into consideration for a correct installation of the control unit 1 Install the Control Unit usi...

Страница 6: ...ed in a vertical position 8 START UP Before starting up Emaux SSCmini unit the following points have to be taken into consideration 1 Check if the filter is completely clean and ensure that the swimmi...

Страница 7: ...ng guide Chapter 12 3 Alarm The unit is not working properly Refer to the Troubleshooting guide Chapter 12 4 Stand by The unit is in between operation cycles 5 Normal operation Electrolytic cell is ge...

Страница 8: ...LED is ON A new cycle will start at 10 00 until 10 30 and so on If you activate Superchlorination mode at 10 30 Superchlorination LED is ON then the unit will be working until 10 30 of the next day a...

Страница 9: ...ebris which has passed through the filter and caught on the plates 3 Try to remove the scale using a plastic or wooden tool do NOT use metal as this will scratch the coating off the plates If the scal...

Страница 10: ...pply Disconnect the unit from power supply for two minutes and then connect it again Ensure that SSCmini is receiving 220V 240VAC 50 60H input LED 4 Water temperature out of working range Test water t...

Страница 11: ...equipment or installation type 4 Damage due to unauthorized product modifications or failure to use Emaux original replacement parts 5 Damage caused by negligence or failure to properly maintain produ...

Страница 12: ...chnical operations Emaux is not liable for any loss of time inconvenience incidental expenses such as labor cost phone calls legal cost or material cost incurred in connection with the replacement or...

Отзывы: