Maintenance
46
The copper oxide of the catalyst furnace is replaced after about 2000 analyses. See chapter
It is safer, but not absolutely essential, to switch off the analyzer.
The components are refitted in reverse order.
NOTICE
Only the outside grid of the furnace is to be handled; the quartz reagent tube must only be held
at the ends.
CAUTION
V0076
Scalding/burns
Hot furnace / combustion tube / analyzer parts
–
Parts of the analyzer can be very hot.
•
Use heat protecting gloves.
Fig. 22: Reagent tubes installing and removing II
A:
Normal position during operation.
B:
The quartz tube (1) of the furnace (2) is raised as far as possible.
C:
It is then swung out together with the furnace (2).
D:
The quartz tube (1) is pulled downwards at an angle.
E:
The furnace (2) is removed.
After replacing the copper oxide, the removed components are refitted in reverse order.
Содержание CS-2000
Страница 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Страница 5: ...5 ...
Страница 63: ...Maintenance 63 Fig 35 Induction furnace Cone ...
Страница 80: ...Function description 80 Fig 51 Gas flow system ...
Страница 91: ...Miscellaneous 91 8 1 6 Furnace Fig 60 Furnace 71031 71010 ...
Страница 98: ...Miscellaneous 98 8 1 12 Tic module Fig 66 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 110: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...