Installation
18
1
Analyzer
2
Resistance furnace
3
Computer
4
Monitor
5
Printer
6
Balance
7
Quad power socket
8
Analyzer mains plug
9
Furnace mains plug
First connect the analyzer to the mains power and switch it on to position 1 in order to win time.
The power switch is located on the front panel in the low left hand corner. Set to position 1. The
reason why to first switch on the analyzer is for the infrared detectors to have time to stabilize
their temperature while cable connections and software start are made.
NOTICE
Never plug the furnace plug (9) into the triple socket on the rear panel of the analyzer.
4.4 Data Interface
Fig. 6: Data interfaces
1
Spare serial interface
2
PC connection (serial interface (COM-port))
3
Analog input/output signals
4
Digital input/output signals
5
Autoloader connection
When all devices are connected to the mains power, then data connections can be made. The
plugs are all different to each other, so that they cannot be interchanged. The required data
1
2
3
4
5
Содержание CS-2000
Страница 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Страница 5: ...5 ...
Страница 63: ...Maintenance 63 Fig 35 Induction furnace Cone ...
Страница 80: ...Function description 80 Fig 51 Gas flow system ...
Страница 91: ...Miscellaneous 91 8 1 6 Furnace Fig 60 Furnace 71031 71010 ...
Страница 98: ...Miscellaneous 98 8 1 12 Tic module Fig 66 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 110: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...