9
Installation and commissioning
Ultrasonic Probe KNX SO250
• Version: 14.09.2020 • Technical changes and errors excepted.
Loud surrounding noise (e.g. when filling metal tanks) may disrupt the measurement.
Please contact us with any questions regarding the area of application or installation.
RG 58
Fig. 2
The area must not be hermetically sealed so that
the filling level in the pipe can change.
If air vents are provided, they must be placed at
the level of the probe (rubber part) (in the figure
above the arrow). Openings in the area of the
measuring track lead to incorrect measurements.
Содержание 70151
Страница 1: ...KNX SO250 Ultrasonic Probe Item number 70151 EN Installation and Adjustment ...
Страница 2: ......
Страница 6: ...4 Clarification of signs ...