
Four Section Boom Operation-common EEC-0021
V1.3
Four Section Boom Operation
Lubrication of the extend cable sheaves located on the boom tip end of the
extend cylinder and the retract cable sheaves located on the inside rear of the 2
nd
and
3
rd
section and the extend cable sheave attached to the bottom of the top plate of the
second section at the sheave case end of the boom are accomplished with the boom
fully retracted. A grease zerk is located on each lubrication point.
Four Section Cable Tensioning
After boom reassembly or from time to time if interior proportioning cables appear loose,
cable tensioning may be required. Tensioning must be done with the boom horizontal
Slightly tighten all cables. Then cycle the boom approx. 4 feet (120cm) out and in a few
times to equalize the extend and retract cable/boom section sequence positioning.
A.
Fully retract boom. Do not induce and hold hydraulic pressure. At full retraction,
observing through the winch mount end of the boom, the second section should
be bottomed on the extend cylinder butt plate, the third section should be
bottomed on the thick vertical side plates welded to the inside of the second
section, the fourth section should be bottomed on the thick vertical side plates
welded to the inside of the third section.
B.
It is important to achieve these boom section positions before torqueing. If the
boom sections do not bottom out as specified (boom is out of sequence), adjust
cables to achieve proper section positioning. After proper section position has
been established, a scribe mark on all the sections at the boom tip end to identify
proper sections at the boom tip end to identify proper section position relative to
each other may be helpful during the tensioning process.
C.
Torque 4/3/2 retract cables to 7 ft-lb (9.5 N.m). Cable adjustment point is located
at the sheave case end of the boom on the bottom of the 2
nd
section. Use the
flats at the front of the cable ends to keep the cables from turning while torqueing
retainer nuts.
Содержание Digger Derrick
Страница 2: ......
Страница 37: ...Nomenclature EEC 0169 V1 0 Nomenclature...
Страница 39: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Страница 54: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Страница 116: ...Jib Operation EEC 0044 V1 1 Jib Operation E C B A C2 C1 B...
Страница 161: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels...
Страница 163: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 12 20 22 23 24 28 29...
Страница 164: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 30 38 39...
Страница 170: ...Digger Derrick Specs EEC 0170 V1 2 Digger Derrick Specifications...
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 179: ...3 2 1 4 6 5 3 2 1 4 6 5 3 2 1 4 6 5 TITLE...
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 193: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 199: ...Four Section Boom Operation common EEC 0021 V1 3 Four Section Boom Operation...
Страница 227: ...4 HYDRAULIC SCHEMATIC...
Страница 240: ...17 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Страница 241: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 245: ...4 5200S...
Страница 246: ...5 6000S...
Страница 247: ...Elliott Operating Manual...
Страница 277: ...Elliott Calibration and Troubleshooting Manual...
Страница 305: ...29 W450321A 09 12 6 The Swing sensor is now disabled The Swing angle window will display N A instead of a number...
Страница 312: ...36 W450321A 09 12...
Страница 362: ......
Страница 375: ...Appendix B Parts Index ELLIOTT Built for You Digger Derrick Truck B 1...