
Jib Operation EEC-0044
V1.1
Jib Operation
their proper locations. Failure to properly secure the jib during stowing and
erecting may allow the jib to fall. Serious personal injury or death could result.
Always have at least one, if not both of the following in place at all times:
Side stow bracket completely engaged into stow hook with stow pin ‘A’ properly
in place.
Both pins ‘C1’ in upper and lower jib holes properly in place through
mating holes in boom tip.
Jib Maintenance
A.
Lubricate sheave pin on jib with grease gun containing chassis grease weekly.
B.
Check for free rotation of jib sheave daily when using jib.
C.
Lubricate jib sheave case pivot pin with grease gun containing chassis grease
monthly.
Jib removal
Should jib removal from the boom become necessary, proceed as follows:
A.
Unstow and swing jib into position on the boom tip according to steps 1-10 in the
preceding jib deployment section.
B.
Support and raise the jib at its balance point and remove the two swing around
pins. Jib is now free of boom.
C.
To install, proceed in reverse order of removal.
Содержание Digger Derrick
Страница 2: ......
Страница 37: ...Nomenclature EEC 0169 V1 0 Nomenclature...
Страница 39: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Страница 54: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Страница 116: ...Jib Operation EEC 0044 V1 1 Jib Operation E C B A C2 C1 B...
Страница 161: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels...
Страница 163: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 12 20 22 23 24 28 29...
Страница 164: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 30 38 39...
Страница 170: ...Digger Derrick Specs EEC 0170 V1 2 Digger Derrick Specifications...
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 179: ...3 2 1 4 6 5 3 2 1 4 6 5 3 2 1 4 6 5 TITLE...
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 193: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 199: ...Four Section Boom Operation common EEC 0021 V1 3 Four Section Boom Operation...
Страница 227: ...4 HYDRAULIC SCHEMATIC...
Страница 240: ...17 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Страница 241: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 245: ...4 5200S...
Страница 246: ...5 6000S...
Страница 247: ...Elliott Operating Manual...
Страница 277: ...Elliott Calibration and Troubleshooting Manual...
Страница 305: ...29 W450321A 09 12 6 The Swing sensor is now disabled The Swing angle window will display N A instead of a number...
Страница 312: ...36 W450321A 09 12...
Страница 362: ......
Страница 375: ...Appendix B Parts Index ELLIOTT Built for You Digger Derrick Truck B 1...